Table 43-1: Estimated Total Cost <strong>of</strong> Introducing SWMPs for Domestic New Build<br />

Projects<br />

Project<br />

Project<br />

Cost<br />

Cost<br />

639<br />

Ass Assumed Ass umed<br />

Average<br />

Average<br />

Cost Cost<br />

Cost<br />

Within Within<br />

Within<br />

Band<br />

Band<br />

Time Time to to Prepare<br />

Prepare<br />

and and Write Write the<br />

the<br />

SWMP<br />

SWMP<br />

Basic<br />

Basic<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

High High<br />

High<br />

Level<br />

Level<br />

SWMP SWMP<br />

SWMP<br />

<strong>International</strong> <strong>Review</strong> <strong>of</strong> <strong>Waste</strong> <strong>Policy</strong>: Annexes<br />

Implementation<br />

Implementation<br />

Basic<br />

Basic<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

High<br />

High<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

Monitoring Monitoring and<br />

and<br />

Auditing<br />

Auditing<br />

Basic<br />

Basic<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

High<br />

High<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

Total Total SWMP SWMP Cost Cost<br />

Cost<br />

Basic<br />

Basic<br />

Level<br />

Level<br />

SWMP<br />

SWMP<br />

High<br />

High<br />

Level<br />

Level<br />

SWMP SWMP<br />

SWMP<br />

£500k £1,600k £200 £300 -£2,300 -£4,600 £500 £1,900 -£1,600 -£2,400<br />

Source: Building Research Establishment (2008) A cost-benefit analysis <strong>of</strong> the introduction <strong>of</strong> site<br />

waste management plans for the construction and demolition industry, Report to Defra.<br />

Table 43-2: Estimated Total Cost Savings from SWMPs for Domestic New Build<br />

Projects<br />

Project<br />

Project<br />

Cost<br />

Cost<br />

Assumed<br />

Assumed<br />

Average<br />

Average<br />

Cost<br />

Cost<br />

Within<br />

Within<br />

Band<br />

Band<br />

<strong>Waste</strong> <strong>Waste</strong> Disposal Disposal<br />

Disposal<br />

Reduction<br />

Reduction<br />

Basic<br />

Level<br />

SWMP<br />

High<br />

Level<br />

SWMP<br />

Resource<br />

Resource<br />

Efficiency Efficiency Gains Gains<br />

Gains<br />

Basic<br />

Level<br />

SWMP<br />

High<br />

Level<br />

SWMP<br />

Total Total Estimated<br />

Estimated<br />

Cost Cost Cost Savings<br />

Savings<br />

Basic<br />

Level<br />

SWMP<br />

High<br />

Level<br />

SWMP<br />

£500k £1,600k £1,200 £2,400 £4,000 £8,000 £5,200 £10,400<br />

Source: Building Research Establishment (2008) A cost-benefit analysis <strong>of</strong> the introduction <strong>of</strong> site<br />

waste management plans for the construction and demolition industry, Report to Defra.