14.12.2012 Views

International Review of Waste Management Policy - Department of ...

International Review of Waste Management Policy - Department of ...

International Review of Waste Management Policy - Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 48-2: Construction and Demolition Debris Recycling Deposits / Bonds<br />

677<br />

<strong>International</strong> <strong>Review</strong> <strong>of</strong> <strong>Waste</strong> <strong>Policy</strong>: Annexes<br />

Deposit/Sq.<br />

Deposit/Sq.<br />

Ft.<br />

Ft.<br />

Mi Minimum Mi<br />

nimum nimum<br />

Sq.Ft.<br />

Sq.Ft.<br />

Maximum<br />

Maximum<br />

Sq.Ft.<br />

Sq.Ft.<br />

Subject Subject to to<br />

to<br />

Deposit Deposit<br />

Deposit<br />

Residential new construction – detached $0.40 500 125,000<br />

Residential new construction - attached $0.40 500 100,000<br />

Non-residential new construction –<br />

commercial<br />

$0.20 1,000 25,000<br />

Non-residential new construction –industrial $0.20 1,000 75,000<br />

Non-residential alterations $0.70 286 No<br />

maximum<br />

Residential demolition $0.70 286 No<br />

maximum<br />

Non-residential demolition $0.20 1,000 No<br />

maximum<br />

Flat Rate<br />

Range Range <strong>of</strong> <strong>of</strong><br />

<strong>of</strong><br />

Depos Deposits Depos ts<br />

(bonds)<br />

(bonds)<br />

$200 -<br />

$50,000<br />

$200 -<br />

$40,000<br />

$200 -<br />

$5,00<br />

$200 -<br />

$15,000<br />

$200 and<br />

up<br />

$200 and<br />

up<br />

$200 and<br />

up<br />

Ro<strong>of</strong> project with tear-<strong>of</strong>f -- -- $200<br />

Residential alterations -- -- $1,000<br />

Source: City <strong>of</strong> San Diego Development Services, Information Bulletin 119 August 2008, Requirements<br />

for Recycling and Disposal <strong>of</strong> Construction and Demolition Debris,<br />

http://www.sandiego.gov/development-services/industry/pdf/infobulletin/ib119.pdf<br />

48.2.5 San Francisco, California, USA<br />

San Francisco’s recycling mandate applies only to mixed construction and demolition<br />

waste in order to ensure it gets processed and diverted from landfill as efficiently as<br />

possible. This requires the contractor to have the mixed waste removed from the site<br />

by a Registered Transporter who must deliver the waste to a Registered Facility. A<br />

Registered Facility must be capable <strong>of</strong> recycling 65% <strong>of</strong> mixed C&D waste. Receipt <strong>of</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!