676<br />

1. for residential construction and demolition, projects that are 1,000 square<br />

feet or greater; or<br />

2. for commercial construction and demolition, projects that are 5,000 square<br />

feet or greater. 819<br />

Several cities in California have adopted mandatory recycling ordinances with a<br />

refunded compliance bond based approach which provides an incentive to<br />

successfully reach the targets. In places where recycling mandates apply it is normal<br />

for a permit scheme to be in place – permits must be obtained in order to undertake<br />

the construction/demolition project. Where the refunded compliance bond scheme is<br />

also applied, the bond is paid when the permit is received, and returned, when pro<strong>of</strong><br />

<strong>of</strong> meeting the mandated recycling standards is received, by the enforcement body.<br />

The size <strong>of</strong> the bond required is calculated in various ways but is usually relative to<br />

the size <strong>of</strong> the construction/demolition project. The following examples from San<br />

Diego, San Jose and San Francisco illustrate this policy mechanism.<br />

48.2.4 San Diego, California, USA<br />

The requirements for recycling and disposal <strong>of</strong> construction and demolition debris<br />

were introduced in San Diego in July 2008. The size <strong>of</strong> the project relates to the size<br />

<strong>of</strong> the bond required as shown in Table 48-2.<br />

Certified Recycling Facilities must be allocated to a project via documentation known<br />

as the ‘<strong>Waste</strong> <strong>Management</strong> Form I’ which must be submitted to San Diego’s<br />

Environmental Services <strong>Department</strong> along with the required bond. The overall<br />

recycling rate was set at 50% for the first six months, after which time it will be<br />

increased to 75%. However, this does include a 90% recycling requirement specific to<br />

inert waste. Recycling, reuse and disposal receipts need to be submitted in order to<br />

retrieve the bond alongside a ‘<strong>Waste</strong> <strong>Management</strong> Form II’. 820<br />

819 City <strong>of</strong> Menlo Park (2008) Construction and Demolition Debris Recycling and Salvage<br />

Requirements, Accessed 24 th October 2008,<br />

http://www.menlopark.org/departments/bld/condemor.pdf<br />

820 The City <strong>of</strong> San Diego Environmental Services <strong>Department</strong> (2008) Requirements for Recycling and<br />

Disposal <strong>of</strong> Construction and Demolition Debris Information Bulletin 119, Accessed 16 th January 2009,<br />

http://www.sandiego.gov/development-services/industry/pdf/infobulletin/ib119.pdf<br />

29/09/09