02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Explanation <strong>of</strong> Funding Changes<br />

<strong>FY</strong> <strong>2012</strong> vs.<br />

<strong>FY</strong> 2011<br />

Request<br />

($000)<br />

Enhanced Surety<br />

<strong>The</strong> decrease reflects an adjustment to RV/RB technology maturation<br />

to focus on maturing and integrating high priority near-term<br />

technologies for the B61 LEP in Weapons Systems Engineering<br />

Assessment Technology. -733<br />

Weapons Systems Engineering Assessment Technology<br />

<strong>The</strong> increase reflects the need for validation-related testing required<br />

for the B61 LEP and future refurbishments. An extensive set <strong>of</strong> data<br />

is needed to validate models and develop computational tools<br />

essential in qualifying the B61. This data includes spatially resolved<br />

thermal radiation emission and absorption measurements;<br />

aeromechanical loading; and high explosive structural property<br />

measurements. +2,133<br />

Nuclear Survivability<br />

<strong>The</strong> slight decrease in nuclear survivability reflects an adjustment on<br />

development and assessment <strong>of</strong> tools and technologies required to<br />

implement the upcoming B61 LEP in Weapons Systems Engineering<br />

Assessment Technology. -241<br />

Enhanced Surveillance<br />

<strong>The</strong> funding is essentially the same, but reflects a focus on aging and<br />

lifetime studies that have an immediate impact to the impending<br />

LEPs/alterations/modifications as well as the continued support for<br />

the annual assessment process. Although some surveillance<br />

diagnostics will be placed on hold, the primary focus will remain on<br />

work needed to maintain the capability to predict the lifetime <strong>of</strong><br />

weapons systems components. -1<br />

Total Funding Change, Engineering Campaign +1,158<br />

Weapons Activities/<br />

Engineering Campaign Page 102<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!