02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FY</strong> 2008<br />

<strong>FY</strong> 2009<br />

Performance<br />

Baseline<br />

7. Schedule <strong>of</strong> Appropriation Requests<br />

(dollars in thousands)<br />

Prior Years <strong>FY</strong> 2011 <strong>FY</strong> <strong>2012</strong> <strong>FY</strong> 2013 <strong>FY</strong> 2014 <strong>FY</strong> 2015 <strong>FY</strong> 2016 Outyears Total<br />

TEC 0 0<br />

OPC 24,508 12,200 6,200 42,908<br />

TPC 24,508 12,200 6,200 0 0 0 0 0 42,908<br />

TEC 153,749 38,100 3,620 195,469<br />

OPC 25,881 14,731 31,647 10,459 82,718<br />

TPC 179,630 52,831 35,267 10,459 0 0 0 0 278,187<br />

TEC 169,749 57,000 12,927 4,655 244,331<br />

<strong>FY</strong> 2010 OPC 29,481 21,500 28,000 21,143 100,124<br />

TPC 199,230 78,500 40,927 25,798 0 0 0 0 344,455<br />

TEC 169,749 57,000 12,927 4,655 244,331<br />

<strong>FY</strong> 2011 OPC 29,481 21,500 28,000 21,143 100,124<br />

TPC 199,230 78,500 40,927 25,798 0 0 0 0 344,455<br />

TEC 169,749 57,000 17,582 0 0 0 0 0 244,331<br />

<strong>FY</strong> <strong>2012</strong> OPC 29,481 21,500 23,345 25,798 100,124<br />

TPC 199,230 78,500 40,927 25,798 0 0 0 0 344,455<br />

8. Related Operations and Maintenance Funding Requirements<br />

99-D-141-02 – Waste Solidification Building<br />

Start <strong>of</strong> Operation or Beneficial Occupancy (fiscal quarter or date) 4Q<strong>FY</strong>2013<br />

Expected Useful Life (number <strong>of</strong> years) a 15<br />

Expected Future Start <strong>of</strong> D&D <strong>of</strong> this capital asset (fiscal quarter) 4Q<strong>FY</strong>2028<br />

(Related Funding requirements)<br />

99-D-141-02 – Waste Solidification Building<br />

(dollars in thousands)<br />

Annual Costs Life Cycle Costs<br />

Current<br />

Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Current<br />

Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Operations 47 ,911 47,911 718,663 718,663<br />

Maintenance 3 ,278 3,278 49,170 49,170<br />

Total, Operations & Maintenance 51,189 51,189 767,833 767,833<br />

a <strong>The</strong> WSB operating life is expected to be approximately 15 years; however the facility has a design life <strong>of</strong> 30 years and<br />

could easily be extended to accommodate disposition <strong>of</strong> additional surplus plutonium.<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-02, Waste Solidification Building Page 408<br />