02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Current<br />

Total<br />

Estimate<br />

(dollars in thousands)<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Construction<br />

Site Preparation 1,300 1,300 1,300<br />

Equipment 4 2,585 42,585 42,585<br />

Other Construction 135,443 135,443 118,025<br />

Contingency 2 2,351 22,351 39,879<br />

Total, Construction 201,679 201,679 201,789<br />

Total, TEC 244,331 244,331 244,331<br />

Contingency, TEC 22,351 22,351 40,596<br />

Other Project Cost (OPC)<br />

OPC except D&D<br />

Conceptual Planning 2,650 2,650 2,650<br />

Conceptual Design 27,440 27,440 27,277<br />

Start-Up 4 9,500 49,500 49,500<br />

Contingency 2 0,534 20,534 20,697<br />

Total, OPC except D&D 100,124 100,124 100,124<br />

D&D<br />

D&D N/A N/A N/A<br />

Contingency N/ A N/A N/A<br />

Total, D&D N/A N/A N/A<br />

Total, OPC 100,124 100,124 100,124<br />

Contingency, OPC 20,534 20,534 20,697<br />

Total, TPC 344,455 344,455 344,455<br />

Total, Contingency 42,885 42,885 61,293<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-02, Waste Solidification Building Page 407<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!