02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9. Required D&D Information<br />

D&D Information Being Requested Square Feet<br />

Area <strong>of</strong> new construction<br />

10,000<br />

Area <strong>of</strong> existing facility(s) being replaced<br />

10,000<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement<br />

0<br />

Name(s) and site location(s) <strong>of</strong> existing facility(s) to be replaced:<br />

a) Buildings: 6571, 6562, 6563, 6520A&B, 6523 and 6523A&C, 6523D Pad, 6524, 6523CAN,<br />

6741A&C, 6742F&G, 6743C&D&J, 6747, 6751, Portion <strong>of</strong> Building 6560;<br />

b) Transportainers (TP)-74, TP-75, and TP-146;<br />

c) Storage Structure OSB-19, OSB-00 and OSB-20, and Storage building 9925G; and<br />

d) the Oil Cooler and associated footings.<br />

<strong>The</strong> D&D will be accomplished using funds from the Readiness in Technical Base and Facilities,<br />

sponsored by Defense Programs, National Nuclear Security Administration. D&D <strong>of</strong> existing facilities<br />

commenced in <strong>FY</strong> 2010 and will be completed by 4Q <strong>FY</strong> <strong>2012</strong>.<br />

10. Acquisition Approach<br />

Renovations:<br />

Design: Firm Fixed-Price (FFP), best value procurement; Architect/Engineer (A/E).<br />

Construction: Well-defined construction packages: competitively bid, FFP, best value procurement.<br />

Undefined construction packages: competitively bid, FFP, best value procurement or use existing Time<br />

and Material (T&M) contracts.<br />

Decontamination & Demolition:<br />

Design: Firm-Fixed Price (FFP), best value procurement; A/E.<br />

Demolition: Use existing unit price contracts.<br />

Decontamination: Use existing T&M contract.<br />

Weapons Activities/RTBF/Construction<br />

09-D-404, Test Capabilities Revitalization-Phase II, SNL Page 200<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!