will undergo a phased closure, consistent with the Consent Order, to be completed by December 29,<br />

2015. It will not be feasible, practical, or realistic to attempt to keep the TRU facilities operational in<br />

the midst <strong>of</strong> Area G closure activities. <strong>The</strong>refore, the TRU waste management capability must be<br />

reconstituted at a location outside <strong>of</strong> the closure boundaries. Closure <strong>of</strong> MDA G is scheduled to start in<br />

<strong>FY</strong> <strong>2012</strong> and must be completed by December 29, 2015.<br />

Total Estimated Cost (TEC)<br />

5. Financial Schedule<br />

(dollars in thousands)<br />

App ropriations Obligations Costs<br />

PED<br />

<strong>FY</strong> 2007 a <strong>FY</strong> 2008<br />

0<br />

2,452<br />

0 0<br />

bc<br />

0 0<br />

<strong>FY</strong> 2009 7,223 0 0<br />

<strong>FY</strong> 2010 0 9,312 408<br />

<strong>FY</strong> 2011 5,000 5,363 11,332<br />

<strong>FY</strong> <strong>2012</strong> 3,518 3,518 4,776<br />

<strong>FY</strong> 2013 0 0 1,677<br />

Total, PED 18,193 18,193 18,193<br />

Construction<br />

<strong>FY</strong> 2008 NA NA NA<br />

<strong>FY</strong> 2009 NA NA NA<br />

<strong>FY</strong> 2010 NA NA NA<br />

<strong>FY</strong> 2011 NA NA NA<br />

Total, Construction NA NA NA<br />

TEC<br />

<strong>FY</strong> 2007 0 0 0<br />

<strong>FY</strong> 2008 2,452 0 0<br />

<strong>FY</strong> 2009 7,223 0 0<br />

<strong>FY</strong> 2010 0 9,312 408<br />

<strong>FY</strong> 2011 5,000 5,363 11,332<br />

<strong>FY</strong> <strong>2012</strong> 3,518 3,518 4,776<br />

<strong>FY</strong> 2013 0 0 1,677<br />

Total, TEC 18,193 18,193 18,193<br />

a No funds were allocated to this PED Line Item during the year-long continuing resolution.<br />

b<br />

<strong>The</strong>se PED funds are entirely for the TRU Waste Facility Project at LANL. Construction funding is detailed and requested<br />

under the data sheet 12-D-301, TRU Waste Facility Project, LANL.<br />

c<br />

Original <strong>FY</strong> 2008 appropriation was $2,474. This was reduced by $22 as a result <strong>of</strong> a mandatory rescission in the <strong>FY</strong> 2008<br />

Consolidated Appropriations Act (P.L. 110-161).<br />

Weapons Activities/RTBF/Construction/<br />

07-D-140, Project Engineering and Design, VL<br />

Page 212<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!