9. Required D&D Information<br />

Area Square Feet<br />

Area <strong>of</strong> new construction 45,000<br />

Area <strong>of</strong> existing operations (s) being replaced 6,727<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement N/A<br />

Name(s) and site location(s) <strong>of</strong> existing facility(s) to be replaced: Buildings 12-17, 12-21A, and 12-63.<br />

<strong>The</strong> site currently has approximately additional 19,000 square feet <strong>of</strong> footprint in various facilities<br />

available for demolition.<br />

10. Acquisition Approach<br />

Various alternatives were considered including a federally managed construction project or a project<br />

utilizing the current Management and Operating contractor, B&W Pantex, LLC. It was determined that,<br />

due to the specialized functionality associated with this project, B&W Pantex, LLC will be responsible<br />

for Title I, II, and III design services and the USACE will be responsible for Title III Construction<br />

Management services.<br />

Weapons Activities/RTBF/Construction/<br />

08-D-802, HE Pressing Facility, PX Page 207<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget