5. Financial Schedule<br />

(dollars in thousands)<br />

App ropriations Obligations Costs<br />

Total Estimated Cost (TEC)<br />

Design<br />

Preliminary Design (06-D-140-02)<br />

<strong>FY</strong> 2008 1,439 a 1,439 24<br />

<strong>FY</strong> 2009 8,245 8,245 3,403<br />

<strong>FY</strong> 2010 5,000 b 5,000 7, 860<br />

<strong>FY</strong> 2011 0 0 2,000<br />

<strong>FY</strong> <strong>2012</strong> 0 0 1,397<br />

Total, Preliminary Design 14,684 14,684 14,684<br />

Final Design (11-D-801)<br />

<strong>FY</strong> 2011 7,500 7,500 6,000<br />

<strong>FY</strong> <strong>2012</strong> 5,200 5,200 6,700<br />

Total, Final Design 12,700 12,700 12,700<br />

Total Design 27,384 27,384 27,384<br />

Construction<br />

<strong>FY</strong> 2011 12,500 12,500 11,000<br />

<strong>FY</strong> <strong>2012</strong> 14,202 14,202 12,940<br />

<strong>FY</strong> 2013 8,889 8,889 9,560<br />

<strong>FY</strong> 2014 8,624 8,624 8,540<br />

<strong>FY</strong> 2015 12,500 12,500 10,680<br />

<strong>FY</strong> 2016 0 0 3,995<br />

Total, Construction 56,715 56,715 56,715<br />

TEC<br />

<strong>FY</strong> 2008 1,439 1,439 24<br />

<strong>FY</strong> 2009 8,245 8,245 3,403<br />

<strong>FY</strong> 2010 5,000 5,000 7,860<br />

<strong>FY</strong> 2011 20,000 20,000 19,000<br />

<strong>FY</strong> <strong>2012</strong> 19,402 19,402 21,037<br />

<strong>FY</strong> 2013 8,889 8,889 9,560<br />

<strong>FY</strong> 2014 8,624 8,624 8,540<br />

<strong>FY</strong> 2015 12,500 12,500 10,680<br />

<strong>FY</strong> 2016 0 0 3,995<br />

Total, TEC 84,099 84,099 84,099<br />

a <strong>FY</strong> 2008 PED includes $360 that was transferred from TA-55 Reinvestment Project Phase I. Funding for both PED<br />

projects were appropriated under the same project line within Project 06-D-140.<br />

b <strong>FY</strong> 2010 PED includes $1,000 that was transferred from 06-D-140-03, PED Radioactive Liquid Waste Treatment Facility<br />

Upgrade. Funding for both PED projects were appropriated under the same project data sheet.<br />

Weapons Activities/RTBF/Construction/<br />

11-D-801, TA-55 Reinvestment Project II, LANL Page 180<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget