9. Required D&D Information<br />

Area Square Feet<br />

Area <strong>of</strong> new construction 33,000<br />

Area <strong>of</strong> existing facility(s) being replaced N/A<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement N/A<br />

Name(s) and site location(s) <strong>of</strong> existing facility(s) to be replaced:<br />

<strong>The</strong> new construction is not replacing an existing facility.<br />

10. Acquisition Approach<br />

99-D-141-02 – Waste Solidification Building<br />

<strong>The</strong> WSB design service was procured through the Savannah River Site Management and Operating<br />

(M&O) contract. Purchase orders for procurement <strong>of</strong> long-lead equipment for the WSB were issued in<br />

<strong>FY</strong> 2009. <strong>The</strong> Savannah River Site M&O will serve as the construction manager. Fixed-price<br />

construction sub-contracts for the WSB were awarded on the basis <strong>of</strong> competitive bidding. <strong>The</strong><br />

acquisition strategy has been finalized.<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-02, Waste Solidification Building Page 409<br />