Tunnel, and d) perform minor targeted facilities modifications to address operational efficiency<br />

needs.<br />

6. Demolish: a) Buildings: 6571, 6562, 6563, 6520A&B, 6523 and 6523A&C, 6523D, 6524, 7525,<br />

6523CAN, 6730, 6741A&C, 6742F&G, 6743C&D&J, 6751A, and a portion <strong>of</strong> Building 6560;<br />

b) Transportainers (TP)-74, TP-75, and TP-146; c) Storage Structures OSB-19, OSB-00 and<br />

OSB-20, and Storage building 9925G, and d) the Oil Cooler and associated footings.<br />

<strong>FY</strong> <strong>2012</strong> activities will include start <strong>of</strong> facilities construction.<br />

<strong>The</strong> project is being conducted in accordance with the project management requirements in DOE<br />

O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all appropriate<br />

project management requirements have been met.<br />

Funds appropriated under this data sheet may be used to provide independent assessments <strong>of</strong> the<br />

planning and execution <strong>of</strong> this project.<br />

Total Estimated Cost (TEC)<br />

5. Financial Schedule<br />

(dollars in thousands)<br />

App ropriations Obligations Costs<br />

PED<br />

<strong>FY</strong> 2005<br />

<strong>FY</strong> 2006<br />

1,589<br />

3,075<br />

1,589 8<br />

a<br />

<strong>FY</strong> 2007 2,219<br />

3,075 2,184<br />

b<br />

2,219 2,102<br />

<strong>FY</strong> 2008 0 0 1,829<br />

<strong>FY</strong> 2009 0 0 760<br />

Total, PED (PED no. 05-D-140) 6,883 6,883 6,883<br />

Construction<br />

<strong>FY</strong> 2009 3,104 3,104 312<br />

<strong>FY</strong> 2010 3,200 3,200 2,758<br />

<strong>FY</strong> 2011 0 0 3,234<br />

<strong>FY</strong> <strong>2012</strong> 25,168 25,168 21,904<br />

<strong>FY</strong> 2013 11,332 11,332 9,406<br />

<strong>FY</strong> 2014 0 0 5,190<br />

Total, Construction 42,804 42,804 42,804<br />

a Original <strong>FY</strong> 2006 appropriation was $4,430. This was reduced by $1,355 as a result <strong>of</strong> a use <strong>of</strong> prior year balance <strong>of</strong>fset<br />

included in the <strong>FY</strong> 2008 Consolidated Appropriation Act (P.L. 110-161).<br />

b Original <strong>FY</strong> 2007 appropriation was $3,064. This was reduced by $845 as a result <strong>of</strong> a use <strong>of</strong> prior year balance <strong>of</strong>fset<br />

included in the <strong>FY</strong> 2008 Consolidated Appropriation Act (P.L. 110-161).<br />

Weapons Activities/RTBF/Construction<br />

09-D-404, Test Capabilities Revitalization-Phase II, SNL Page 196<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget