Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12-D-301, TRU<br />

Waste Facilities,<br />

LANL<br />

11-D-801, TA-55<br />

Reinvestment<br />

Project, Phase 2,<br />

LANL<br />

Total<br />

Estimated<br />

Cost (TEC) b<br />

Construction Projects a<br />

Prior Year<br />

Appropriations<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

Unappropriated<br />

Balance<br />

71,000 -<br />

124,000 0 0 0 9,881 61,119 - 114,119<br />

75,400 -<br />

99,900 0 0 20,000 19,402 38,845 - 60,345<br />

10-D-501, Nuclear<br />

Facility Risk<br />

Reduction (NFRR),<br />

Y-12 65,796 0 12,500 0 35,387 17,909<br />

09-D-404, Test<br />

Capabilities<br />

Revitalization-II,<br />

SNL 42,804 3,104 3,200 0 25,168 TBD<br />

09-D-007, LANSCE-<br />

Refurbishment,<br />

LANL c<br />

08-D-802, High<br />

Explosive Pressing<br />

Facility, PX d<br />

(dollars in thousands)<br />

TBD 19,300 0 0 0 0<br />

134,217 613 0 30,000 66,960 36,644<br />

08-D-801, High<br />

Pressure Fire Loop,<br />

PX 40,716 8,806 31,910 0 0 0<br />

a <strong>The</strong> TEC estimate is for design only for the PED projects included in 07-D-140 and 06-D-140.<br />

b<br />

Where cost ranges are shown, they are for Total Project Cost (TPC) not Total Estimated Cost (TEC). Otherwise, all point<br />

estimates are for TEC.<br />

c $27,690 in previously appropriated funding for LANSCE-R has been converted from line-item funding to the Operations <strong>of</strong><br />

Facilities subprogram in accordance with H.R. 4899, the Supplemental Appropriations Act, 2010.<br />

d $41,781 in previously appropriated funding for 08-D-802, High Explosive Pressing Facility, PX were directed to be used as<br />

a use <strong>of</strong> prior year balance <strong>of</strong>fset by the <strong>Energy</strong> and Water Development and Related Agencies Appropriations Act, 2010<br />

(P.L. 111-85).<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities<br />

Capital Operating Expenses<br />

and Construction Summary Page 163<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget