Building 9204-2E<br />

Replace a Kathabar (large humidifier) needed to maintain humidity within ±2 percent required for<br />

manufacturing parts, upgrade monitoring/control systems in the environmental room, and upgrade<br />

inefficient/degraded house and machine vacuum systems.<br />

Critical Decision 3A approved the demolition <strong>of</strong> Kathabar 3350.<br />

Brief Description<br />

System Building 9212 Scope<br />

Steam distribution system Replace degraded steam line and pressure-reducing stations in Building 9212.<br />

Cooling Tower water Dismantle and remove (D&R) final tie-ins and replace at same location; Install new<br />

piping and valves in an alternate location. Not included in the scope is the removal<br />

<strong>of</strong> the abandoned equipment.<br />

Motor Control Centers<br />

(MCC) 231-1A, 354-1A<br />

D&R the old MCC (231-1A) and install a new Power Panel in a nearby location.<br />

D&R the old MCC (354-1A) and Install a new, smaller MCC in an alternate<br />

location.<br />

Switchgear 218 D&R the old switchgear and install new switchgear in the same location.<br />

Switchgears 221 / 308 Provide new switchgear breakers and install in the existing locations.<br />

Stack 33 automatic control<br />

system<br />

Casting furnace vacuum<br />

system pumps<br />

Stacks 110 and 43 fans,<br />

motors, and filter housings<br />

Stacks 38, and 48 fans,<br />

motors, and filter housings<br />

Install a manually operated damper control system to replace the current<br />

(inoperable) automatic system.<br />

D&R two <strong>of</strong> the existing vacuum pumps and install new ones in the same location.<br />

Install new equipment in an alternate location, route exhaust flows to the existing<br />

stack 110. D&R Stack 43.<br />

Install new equipment in an alternate location, combine exhaust flows to a single,<br />

combined new stack.<br />

Stack 27 ductwork Replace ductwork in basement by providing an alternate routing exterior to the<br />

building to a combination <strong>of</strong> new ro<strong>of</strong> exhaust fans and Stack 28, not located in the<br />

head house basement. D&R <strong>of</strong> the existing stack and associated equipment in the<br />

basement is not included in the NFRR scope.<br />

9 204-2E Scope<br />

Kathabar system replacement Upgrade the Kathabar 3350 system.<br />

<strong>FY</strong> <strong>2012</strong> activities include start <strong>of</strong> construction.<br />

Funds appropriated under this data sheet may be used to provide independent assessments <strong>of</strong> the<br />

planning and execution <strong>of</strong> this project. Construction funds appropriated in <strong>FY</strong> <strong>2012</strong> will be used only<br />

after CD-3 approval.<br />

<strong>The</strong> project is being conducted in accordance with the project management requirements in DOE<br />

O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all appropriate<br />

project management requirements have been met.<br />

Weapons Activities/RTBF/Construction/<br />

10-D-501, Nuclear Facility Risk Reduction, Y-12 Page 187<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget