granularity <strong>of</strong> the costs required to operate and maintain nuclear security enterprise facilities. Work has<br />

been organized by capabilities provided, such as material operations, component production, fabrication<br />

and assembly, and testing. Infrastructure funding ensures environmental compliance and energy and<br />

operational efficiency throughout the nuclear security enterprise, while modernizing, streamlining,<br />

consolidating, and sustaining the stewardship and vitality <strong>of</strong> the sites.<br />

<strong>The</strong> NNSA will continue to institutionalize responsible and accountable corporate facilities management<br />

processes and incorporate best practices from industry and other organizations. This includes<br />

implementation <strong>of</strong> a planning process that results in the submission <strong>of</strong> Ten-Year Site Plans that establish<br />

the foundation for the strategic planning <strong>of</strong> the facilities and infrastructure <strong>of</strong> the enterprise. <strong>The</strong> NNSA<br />

works proactively with its contractors, external regulators, and host communities to assure that facilities<br />

and operations are in compliance with all applicable statutes and agreements to preclude any adverse<br />

impact to the environment, safety, and health <strong>of</strong> workers and the public and to address emergency<br />

management issues while minimizing unscheduled disruption to program activities that could affect<br />

performance.<br />

Infrastructure investments play a critical role in revitalizing the nuclear weapons manufacturing and<br />

research and development enterprise. Investments improve the responsiveness and/or utility <strong>of</strong> the<br />

infrastructure and its technology base. <strong>The</strong> NNSA focuses its construction on two primary objectives:<br />

(1) planning, and prioritization <strong>of</strong> the projects required to support the weapons programs, and<br />

(2) development and execution <strong>of</strong> these projects within approved cost and schedule baselines.<br />

<strong>The</strong> <strong>FY</strong> <strong>2012</strong> contains significant investments in CMRR-NF and UPF. <strong>The</strong> high priority <strong>of</strong> both<br />

projects was highlighted in the Nuclear Posture Review. Consistent with NNSA’s increased emphasis<br />

on project management rigor, baseline cost and schedule will not be finalized until the projects achieve<br />

90% design maturity. <strong>The</strong> projects are scheduled to achieve 90% design maturity in late <strong>FY</strong> <strong>2012</strong>, and<br />

the <strong>Department</strong> will set the performance baseline in <strong>FY</strong> 2013. <strong>The</strong> increased funding level in the<br />

<strong>FY</strong> <strong>2012</strong>-<strong>FY</strong> 2016 period is needed to support the required schedule <strong>of</strong> construction completion in<br />

<strong>FY</strong> 2020 and a ramp-up to full operations by <strong>FY</strong> 2023 for CMRR-NF and <strong>FY</strong> 2024 for UPF.<br />

In <strong>FY</strong> <strong>2012</strong>, funding will also support investments to shift production operations at the Kansas City<br />

Plant to a new leased facility (currently under construction) and specific projects at the Los Alamos<br />

National Laboratory (LANL), Pantex Plant, Sandia National Laboratories (SNL), and Y-12 National<br />

Security Complex. <strong>The</strong> Transuranic Waste Facility Project at LANL will allow the site to comply with<br />

an Order <strong>of</strong> Consent with the State <strong>of</strong> New Mexico which requires the cleanup and vacating <strong>of</strong><br />

Technical Area 54. Projects for TA-55 Reinvestment Project Phase II support infrastructure system<br />

upgrades to extend the life <strong>of</strong> the existing facility at LANL. <strong>The</strong> High Explosive Pressing Facility<br />

project at Pantex will replace current facilities which are nearing the end <strong>of</strong> their service lives. <strong>The</strong> Test<br />

Capabilities Revitalization–Phase II Project at SNL will refurbish non-nuclear capabilities to support<br />

timely certification components for the B61 and future LEPs. <strong>The</strong> Nuclear Facility Risk Reduction<br />

Project at Y-12 will upgrade infrastructure systems in buildings 9212 and 9204-2E to ensure continuity<br />

<strong>of</strong> capability and continued safe operations until they are transitioned to UPF.<br />

Weapons Activities Overview <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />