(dollars in thousands)<br />

App ropriations Obligations Costs<br />

<strong>FY</strong> 2011 6,661 7,024 12,993<br />

<strong>FY</strong> <strong>2012</strong> 14,341 14,341 12,185<br />

<strong>FY</strong> 2013 14,216 14,216 10,943<br />

<strong>FY</strong> 2014 TBD TBD TBD<br />

<strong>FY</strong> 2015 TBD TBD TBD<br />

<strong>FY</strong> 2016 TBD TBD TBD<br />

<strong>FY</strong> 2017 TBD TBD TBD<br />

Total, TPC TBD TBD TBD<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

Total Estimated Cost (TEC)<br />

Current<br />

Total<br />

Estimate<br />

(dollars in thousands)<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Design (PED) (07-D-140-2)<br />

Design 1 4,675 N/A TBD<br />

Contingency 3, 518 N/A TBD<br />

Total, PED 18,193 N/A TBD<br />

Construction<br />

Site Preparation 9,881 N/A TBD<br />

Equipment TB D N/A TBD<br />

Other Construction TBD N/A TBD<br />

Contingency TB D N/A TBD<br />

Total, Construction TBD N/A TBD<br />

N/A<br />

Total, TEC TBD N/A TBD<br />

Contingency, TEC TBD N/A TBD<br />

Other Project Cost (OPC)<br />

OPC except D&D<br />

Conceptual Planning 1,500 N/A TBD<br />

Conceptual Design 2,700 N/A TBD<br />

Start-Up TBD N/A TBD<br />

Contingency TB D N/A TBD<br />

Total, OPC except D&D TBD N/A TBD<br />

Weapons Activities/RTBF/Construction/<br />

12-D-301, TRU Waste Facility Project,<br />

LANL <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 171

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!