<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

(dollars in thousands)<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

• MOX LEU Inventory Project: Complete down-blending <strong>of</strong> HEU at Nuclear Fuel Services<br />

(NFS) by the end <strong>of</strong> <strong>2012</strong>. <strong>The</strong> resulting LEU will create an inventory for potential backup<br />

use by utilities participating in the MOX plutonium disposition program.<br />

• Reliable Fuel Supply Project: Complete down-blending in December 2011. All HEU<br />

shipments were provided to the contractor in December 2009. Barter funding is used to pay<br />

the down-blending contractor.<br />

• Planning for Additional Projects: Prepare plans to process, characterize, and package<br />

additional surplus HEU for down-blending and ultimate disposition. <strong>The</strong> material is located<br />

at various sites in the DOE complex, including Y-12, SRS, LANL, Idaho National<br />

Laboratory, and Lawrence Livermore National Laboratory.<br />

Supporting Activities 312 0 0<br />

• Monitoring and Inspection 208 0 0<br />

This subprogram was realigned and is funded under the Russian Surplus Fissile Materials<br />

Disposition Program beginning in <strong>FY</strong> 2011.<br />

• Plutonium Disposition Program<br />

Integration 104 0 0<br />

This subprogram was realigned and is funded under U.S. Plutonium Disposition beginning in<br />

<strong>FY</strong> 2011.<br />

Construction 574,238 612,788 578,754<br />

• 99-D-141-01, Pit Disassembly and<br />

Conversion (PDC) 0 80,000 176,000<br />

Approximately 75 percent <strong>of</strong> surplus plutonium to be dispositioned is in pit form. <strong>The</strong>se pits<br />

must be disassembled and the plutonium converted to an oxide form useable as feedstock for the<br />

MFFF. <strong>The</strong> NNSA and EM conducted an alternative analysis to identify potential cost-saving<br />

alternatives for the PDC mission. On November 22, 2009, the <strong>Department</strong> approved exploring<br />

the combination <strong>of</strong> NNSA’s PDCF and EM’s PuP projects into a single project to be located in<br />

K-Area Reactor Facility at the SRS and managed by the NNSA. As a result, the project team is<br />

currently developing a conceptual design report, including NEPA and other documentation to<br />

support Critical Decision (CD) -1 (Approve Alternative Selection and Cost Range), in<br />

accordance with DOE Order 413.3B. CD-1 is expected to be approved in the 2nd quarter <strong>of</strong><br />

<strong>FY</strong> 2011. As part <strong>of</strong> the preliminary execution strategy for the combined approach, the project<br />

has been divided into four sub-projects. <strong>The</strong>se are: 1) stabilization and packaging (S&P) line,<br />

2) material storage (MS), 3) infrastructure and 4) pit processing, respectively. Establishing these<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition Page 383<br />