02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Detailed Justification<br />

(dollars in thousands)<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

Operations <strong>of</strong> Facilities 1,336,399 1,257,991 1,485,254<br />

Operates and maintains NNSA-owned programmatic capabilities in a state <strong>of</strong> readiness, ensuring<br />

each capability (workforce and facility) is operationally ready to execute programmatic tasks <strong>of</strong> the<br />

entire nuclear security enterprise. Operates the program infrastructure and facilities in a safe,<br />

secure, reliable, and “ready for operations” manner. <strong>The</strong> RTBF Operations <strong>of</strong> Facilities subprogram<br />

provides and sustains core capabilities, including: material operations capability, such as plutonium,<br />

uranium, tritium and high explosive materials; component production, fabrication, and assembly<br />

capability; testing capability, such as environmental testing, special nuclear and non-nuclear<br />

material testing; and site mission and infrastructure support.<br />

<strong>The</strong> NNSA tracks, manages, and justifies the RTBF Operations <strong>of</strong> Facilities portion <strong>of</strong> the<br />

President’s Budget Request using a recently revised Work Breakdown Structure (WBS). <strong>The</strong> RTBF<br />

Operations <strong>of</strong> Facilities WBS has been redesigned to provide better insight and granularity <strong>of</strong> the<br />

costs required to operate and maintain nuclear security enterprise facilities. <strong>The</strong> new WBS is<br />

organized by capabilities provided, such as material operations, component production, fabrication<br />

and assembly, and testing. At the most detailed level <strong>of</strong> the Operations <strong>of</strong> Facilities WBS, all<br />

identified capabilities are separated into three distinct categories: Operations, Capability Risk<br />

Reduction, and Transformation. <strong>The</strong>se categories contain all activities performed at specific sites,<br />

including: facilities management; maintenance; utilities; environment, safety and health; capital<br />

equipment; emergency operations; waste management; maintenance <strong>of</strong> the Authorization Basis for<br />

each facility per 10CFR830, National Environmental Policy Act activities; and, general plant<br />

projects. “Operations” includes daily operations, infrastructure, corrective and some preventive<br />

maintenance, and staffing requirements. <strong>The</strong> “Capability Risk Reduction” category includes<br />

activities associated with sustaining equipment, systems, facilities, or capabilities to sustain their<br />

performance or good operating condition, as well as activities that ensure current capabilities will<br />

meet safety requirements, sustain effectiveness and/or extend the life <strong>of</strong> that capability. Finally, the<br />

“Transformation” category includes all activities related to reducing Site footprints, related security<br />

requirements, the hazard/safety categorization <strong>of</strong> a facility/capability or the development/start-up <strong>of</strong><br />

a new or replacement capability. <strong>The</strong> majority <strong>of</strong> the budget request supports “Operations” and<br />

reflects an infrastructure that provides a minimum-operations capability state <strong>of</strong> readiness.<br />

<strong>The</strong> RTBF Operations <strong>of</strong> Facilities budget request generally supports minimum-operations<br />

capability conditions <strong>of</strong> RTBF funded facilities, infrastructure and capabilities. Under a “minimumoperations”<br />

level <strong>of</strong> operation, base operations are sufficient to sustain the capability through the<br />

fiscal year, assuming the absence <strong>of</strong> significant upset conditions or emergent requirements.<br />

Operations <strong>of</strong> Facilities also funds general infrastructure support activities such as General Plant<br />

Projects (GPP) and Other Project Costs (OPCs) for line item construction projects. However in the<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities Page 147<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!