Phase C: Glovebox Stand 3, Exhaust Stack, UPS, Criticality Alarm System, and Vault Water<br />

Tanks<br />

Glovebox Stands Group 3 – Seismically upgrade the stands for the identified high priority gloveboxes to<br />

ensure gloveboxes remain intact and do not topple during a seismic event.<br />

Upgrade the sampling system for existing PF-4 exhaust stacks so that exhaust measuring equipment<br />

meets industry standards.<br />

Replace existing Uninterruptible Power Supply with nuclear grade equipment and relocate from the<br />

PF-4 to a new structure to allow simpler maintenance, proper exhaust, and to minimize mixed waste<br />

generation.<br />

Upgrade two Pu-238 water storage tanks cooling system within the PF-4.<br />

Replace existing Criticality Alarm detectors and circuits in the PF-4 with new and expandable detectors<br />

and electronics.<br />

Weapons Activities/RTBF/Construction/<br />

11-D-801, TA-55 Reinvestment Project II, LANL Page 179<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget