(dollars in thousands)<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

such as the HE manufacturing facility are also included as Pantex awaits construction <strong>of</strong> new<br />

HE operations facilities.<br />

• Sandia National Laboratories (SNL) 103,618 117,369 120,708<br />

<strong>The</strong> RTBF Operations <strong>of</strong> Facilities at SNL provides multiple capabilities in support <strong>of</strong> the<br />

nuclear security enterprise, including: nuclear weapon assessment and certification; weapon<br />

component design, testing and manufacturing, including LEPs; major environmental testing;<br />

Microelectronics and Engineering Sciences Applications; engineering and material sciences;<br />

remote testing ranges for joint test assemblies; and waste management activities. <strong>The</strong> dominant<br />

cost driver for these capabilities is the staff required to keep the mission critical capabilities<br />

operational.<br />

In <strong>FY</strong> <strong>2012</strong>, in addition to maintaining a level <strong>of</strong> expertise among the staff, RTBF will support<br />

major environmental test facilities, including electromechanical, abnormal and normal<br />

environments, Microelectronics Development Laboratory, Tech Area IV Accelerators,<br />

Tech Area V Nuclear Reactor facilities, Electromagnetic Test Facilities, Materials<br />

Characterization Laboratories and the Tonopah Test Range (TTR) in Nevada. Facilities will<br />

cyclically operate at minimum-operations levels rotating staff on a planned schedule to<br />

accommodate mission needs.<br />

In <strong>FY</strong> <strong>2012</strong>, the RTBF Operations funding provides minimum-operations capability level for<br />

TTR while also providing limited recapitalization <strong>of</strong> equipment. <strong>The</strong> TTR provides unique<br />

capabilities to air drop nuclear bomb test units, supporting DSW’s ability to perform surveillance<br />

testing on nuclear bombs and test their compatibility with U.S. Air Force bombers and fighters.<br />

Funding also provides for the initiation <strong>of</strong> recapitalization <strong>of</strong> testing equipment to support<br />

increased DSW surveillance activities for the W76 and B61, and support for the essential<br />

capabilities in microsystems and radiation hardness, engineering and material sciences that are<br />

required to support the B61 LEP and potential LEPs on the W78 and the W88.<br />

• Savannah River Site (SRS) 131,129 92,722 97,767<br />

<strong>The</strong> RTBF Operations <strong>of</strong> Facilities at SRS provides the tritium operations capability in support<br />

<strong>of</strong> the nuclear security enterprise, which is unique to the enterprise and includes: production,<br />

reclamation <strong>of</strong> gas transfer systems for limited life component exchange and LEPs; production,<br />

recycling, and recovery <strong>of</strong> tritium and deuterium gases; surveillance <strong>of</strong> Gas Transfer Systems;<br />

packaging design, maintenance, and certification; and storage <strong>of</strong> national security legacy<br />

components and materials.<br />

In <strong>FY</strong> <strong>2012</strong>, funding supports activities leading to the replacement <strong>of</strong> <strong>The</strong>rmal Cycle Absorption<br />

Process hybrid beds, starts modernization activities <strong>of</strong> the existing facilities to support<br />

infrastructure initiatives, and supports the DSW Limited Life Components (LLCs) schedule.<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities Page 151<br />