Total Estimated Cost (TEC)<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

Current<br />

Total<br />

Estimate<br />

(dollars in thousands)<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Design (PED)<br />

Design 1 6,390 TBD NA<br />

Contingency 1, 803 TBD NA<br />

Total, PED 18,193 TBD NA<br />

Construction<br />

Site Preparation NA NA NA<br />

Equipment NA NA NA<br />

Other Construction NA NA NA<br />

Contingency NA NA NA<br />

Total, Construction NA NA NA<br />

Total, TEC TBD TBD NA<br />

Contingency, TEC<br />

TBD TBD NA<br />

Other Project Cost (OPC)<br />

OPC except D&D<br />

Conceptual Planning NA NA NA<br />

Conceptual Design NA NA NA<br />

Start-Up NA NA NA<br />

Contingency NA NA NA<br />

Total, OPC except D&D NA NA NA<br />

D&D<br />

D&D NA NA NA<br />

Contingency NA NA NA<br />

Total, D&D NA NA NA<br />

Total, OPC NA NA NA<br />

Contingency, OPC NA NA NA<br />

Total, TPC NA NA NA<br />

Total, Contingency NA NA NA<br />

Weapons Activities/RTBF/Construction/<br />

07-D-140, Project Engineering and Design, VL<br />

Page 214<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!