12-D-301, Transuranic (TRU) Waste Facility,<br />

Los Alamos National Laboratory (LANL), Los Alamos, New Mexico<br />

Project Data Sheet (PDS) is for Construction<br />

1. Significant Changes<br />

<strong>The</strong> most recent DOE O 413.3B approved Critical Decision (CD) is CD-1, Approve Alternative<br />

Selection and Cost Range that was approved on August 10, 2010, with the preliminary cost range <strong>of</strong><br />

$71,000 to $124,000 and a preliminary CD-4 range <strong>of</strong> <strong>FY</strong> 2015 to <strong>FY</strong> 2018.<br />

A Federal Project Director at the appropriate level has been assigned to this project.<br />

This PDS is new for <strong>FY</strong> <strong>2012</strong>.<br />

2. Design, Construction, and D&D Schedule<br />

(fiscal quarter or date)<br />

CD-0 CD-1<br />

PED<br />

Complete CD-2 CD-3 CD-4 D&D Start<br />

D&D<br />

Complete<br />

<strong>FY</strong> <strong>2012</strong> 02/07/2006 8/10/2010 TBD TBD TBD TBD N/A N/A<br />

Phase A: Infrastructure and Site Improvements<br />

(fiscal quarter or date)<br />

PED<br />

CD-0 CD-1 Complete CD-2 CD-3 CD-4 D&D Start<br />

<strong>FY</strong> <strong>2012</strong> 02/07/2006 8/10/2010 7/6/2011 3/09/2011 a 1/9/<strong>2012</strong> 2/01/2013 b N/A N/A<br />

D&D<br />

Complete<br />

Phase B: Staging and Characterization Facilities<br />

(fiscal quarter or date)<br />

CD-0 CD-1<br />

PED<br />

Complete CD-2 CD-3 CD-4 D&D Start<br />

D&D<br />

Complete<br />

<strong>FY</strong> <strong>2012</strong> 02/07/2006 8/10/2010 TBD TBD TBD TBD N/A N/A<br />

3. Baseline and Validation Status<br />

TEC, TEC,<br />

OPC OPC,<br />

PED Construction TEC, Total Except D&D D&D OPC, Total TPC<br />

71,000 –<br />

<strong>FY</strong> <strong>2012</strong> 18,193 TBD TBD TBD TBD TBD 124,000<br />

a Date <strong>of</strong> anticipated CD-2 approval.<br />

b Date <strong>of</strong> proposed baseline CD-4 schedule.<br />

Weapons Activities/RTBF/Construction/<br />

12-D-301, TRU Waste Facility Project,<br />

LANL <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 167