10-D-904, Naval Reactors Facility (NRF) Infrastructure Upgrades, Idaho<br />

Project Data Sheet (PDS) is for PED/Construction<br />

1. Significant Changes<br />

<strong>The</strong> most recent DOE O 413.3B approved Critical Decision (CD) is CD-1, Approve Alternative<br />

Selection & Cost Range that was approved on June 25, 2010, with a preliminary cost estimate <strong>of</strong><br />

$16,357 and CD-4 <strong>of</strong> <strong>FY</strong> 2016.<br />

A Federal Project Director at the appropriate level has been assigned to this project.<br />

This PDS is an update <strong>of</strong> the <strong>FY</strong> 2011 PDS. CD-2 was approved in November 4, 2010. <strong>The</strong>re have<br />

been no significant changes to scope, cost, schedule, or risks associated with this project.<br />

2. Design, Construction, and D&D Schedule<br />

(fiscal quarter or date)<br />

CD-0 CD-1<br />

PED<br />

Complete CD-2 CD-3 CD-4 D&D Start<br />

D&D<br />

Complete<br />

<strong>FY</strong> 2010 3Q<strong>FY</strong>2009 1Q<strong>FY</strong>2010 1Q<strong>FY</strong>2011 TBD TBD TBD TBD TBD<br />

<strong>FY</strong> 2011 04/07/2009 2Q<strong>FY</strong>2010 1Q<strong>FY</strong><strong>2012</strong> TBD TBD TBD TBD TBD<br />

<strong>FY</strong> <strong>2012</strong> 04/07/2009 06/25/2010 1Q<strong>FY</strong><strong>2012</strong> 11/04/2010 2Q<strong>FY</strong><strong>2012</strong> 4Q<strong>FY</strong>2016 N/A N/A<br />

CD-0 – Approve Mission Need<br />

CD-1 – Approve Alternative Selection and Cost Range<br />

CD-2 – Approve Performance Baseline<br />

CD-3 – Approve Start <strong>of</strong> Construction<br />

CD-4 – Approve Start <strong>of</strong> Operations or Project Closeout<br />

D&D Start – Start <strong>of</strong> Demolition & Decontamination (D&D) work<br />

D&D Complete – Completion <strong>of</strong> D&D work<br />

3. Baseline and Validation Status<br />

TEC, TEC,<br />

(dollars in thousands)<br />

OPC OPC,<br />

PED Construction TEC, Total Except D&D D&D OPC, Total TPC<br />

<strong>FY</strong> 2010 1,200 TBD TBD 443 TBD TBD TBD<br />

<strong>FY</strong> 2011 1,200 TBD TBD 182 TBD TBD TBD<br />

<strong>FY</strong> <strong>2012</strong> 1,200 12,000 13,200 3,157 N/A 3,157 16,357<br />

4. Project Description, Justification, and Scope<br />

<strong>The</strong> Naval Reactors Facility Infrastructure Upgrades project primarily addresses the design,<br />

procurement, and installation <strong>of</strong> a modern, code compliant fire alarm system to ensure the continued<br />

protection <strong>of</strong> NRF personnel, equipment, and facilities. Furthermore, the project will address additional<br />

life safety improvements across the NRF that are being determined in conjunction with final design.<br />

Naval Reactors/Construction<br />

10-D-904 – NRF Infrastructure Upgrades, Idaho Page 465<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget