02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(dollars in thousands)<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

In <strong>FY</strong> <strong>2012</strong>, this subprogram will continue to support the early stages <strong>of</strong> development <strong>of</strong> advanced<br />

radiographic technologies, especially as required for hydrodynamic experiments, dynamic<br />

plutonium experiments, and scaling and surrogacy experiments, as defined in the Primary<br />

Assessment Plan. <strong>The</strong> subprogram will also continue the development <strong>of</strong> the next-generation<br />

camera for the pRad facility at LANSCE.<br />

Secondary Assessment Technologies 77,581 81,949 86,061<br />

Secondary Assessment Technologies provides capabilities underpinning improved assessment for<br />

stockpile secondaries. <strong>The</strong>se improvements are used to strengthen the certification process, to<br />

enable consideration <strong>of</strong> a broad range <strong>of</strong> options for future LEPs, and to provide a sound basis for<br />

quantifying threats posed by non-stockpile weapons.<br />

In <strong>2012</strong>, one major focus <strong>of</strong> the subprogram includes the successful completion <strong>of</strong> the longstanding<br />

energy balance problem with validation experiments at NIF and Z. <strong>The</strong> focus is now<br />

beginning to shift to developing and validating other aspects <strong>of</strong> performance. Over the next few<br />

years, starting in <strong>2012</strong>, a series <strong>of</strong> experiments described in the three year High <strong>Energy</strong> Density<br />

Physics experimental plan will be conducted. <strong>The</strong>se experiments are aimed at reducing key<br />

uncertainties in secondary performance through improvements in fundamental physical data used<br />

by simulation codes. Improved computational models <strong>of</strong> secondary performance will be<br />

developed and used to reduce uncertainties in calculations <strong>of</strong> critical aspects <strong>of</strong> performance. Our<br />

ability to quantitatively predict weapons outputs will be strengthened through updating models<br />

based on historical tests and quantifying key science uncertainties and their impact on these<br />

assessments. Finally the secondary assessment plan will be updated to reflect the significant<br />

progress over the past two years.<br />

Total, Science Campaign 294,548 365,222 405,939<br />

Weapons Activities/<br />

Science Campaign Page 90<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!