Review Team (IRT), comprised <strong>of</strong> subject matter experts from across the Enterprise, concurred with the<br />

overall conclusion and recommended combining the two projects.<br />

On November 22, 2009, the <strong>Department</strong> approved exploring the combination <strong>of</strong> NNSA’s PDCF and<br />

EM’s PuP projects into a single project to be located in the K-Area Reactor Facility at the SRS and<br />

managed by the NNSA. <strong>The</strong> project team developed a conceptual design report, including NEPA and<br />

other documentation to support Critical Decision (CD) -1 (Approve Alternative Selection and Cost<br />

Range), in accordance with DOE Order 413.3B. <strong>The</strong> single project will be renamed the “Pit<br />

Disassembly and Conversion (PDC) Project.” CD-1 is expected to be approved in the 2 nd quarter <strong>of</strong><br />

<strong>FY</strong> 2011. As part <strong>of</strong> the preliminary execution strategy, the PDC project has been divided into four subprojects<br />

that align with the scope and schedule associated with the program requirements. <strong>The</strong> PDC<br />

sub-projects are: 1) stabilization and packaging (S&P) line, 2) material storage (MS), 3) infrastructure,<br />

and 4) pit processing. Establishing these sub-projects will enhance NNSA’s ability to manage smaller,<br />

stand-alone scopes-<strong>of</strong>-work, while still managing the interface between the sub-projects.<br />

<strong>The</strong> current conceptual integrated project plan maximizes the combined project’s ability to support the<br />

program requirements. One <strong>of</strong> the most significant risks associated with the current conceptual plan is<br />

associated with receipt <strong>of</strong> the full budget requirements to support construction readiness and long-lead<br />

procurements, associated with S&P, MS, infrastructure, and support facilities, which could further delay<br />

the sub-projects’ start-up and operation and increase the overall program/projects risks associated with<br />

supplying plutonium feedstock for steady-state MOX fuel fabrication. Other high risks identified are<br />

primarily associated with the sufficiency <strong>of</strong> skilled engineering, construction resources, and NQA-1<br />

suppliers for all sub-projects as well as technology maturity for pit processing sub-project and<br />

construction within a secure operating facility. For each <strong>of</strong> these risks, the project has identified and is<br />

managing risk mitigation strategies.<br />

An integrated conceptual project execution plan has been developed. <strong>The</strong> funding pr<strong>of</strong>ile for future<br />

years will be updated when the estimates are validated and a baseline has been approved as part <strong>of</strong> the<br />

critical decision process. As a result, all funding estimates shown in this PDS are unvalidated. As the<br />

project design continues to mature in <strong>FY</strong> 2011, and upon approval <strong>of</strong> CD-1, construction funds may be<br />

needed in <strong>FY</strong> <strong>2012</strong> to support MS and S&P activities such as long-lead procurements and demolition<br />

and removal.<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-01, Pit Disassembly and<br />

Conversion <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 412

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!