Construction Projects Total Project Cost (TPC)<br />

(dollars in thousands)<br />

<strong>FY</strong> <strong>2012</strong> <strong>FY</strong> 2013 <strong>FY</strong> 2014 <strong>FY</strong> 2015 <strong>FY</strong> 2016<br />

99-D-141-01, PDC OPC 45,600 47,507 50,512 61,000 90,000<br />

99-D-141-01, PDC TEC 176,000 315,000 321,000 227,000 317,000<br />

99-D-141-01, PDC TPC 221,600 362,507 371,512 338,000 407,000<br />

99-D-141-02, WSB OPC 23,345 25,798 0 0 0<br />

99-D-141-02, WSB TEC 17,582 0 0 0 0<br />

99-D-141-02, WSB TPC 40,927 25,798 0 0 0<br />

99-D-143, MOX OPC 97,035 246,669 230,697 91,603 5,999<br />

99-D-143, MOX TEC 385,172 322,802 109,661 125,773 37,805<br />

99-D-143, MOX TPC 482,207 569,471 340,358 217,376 43,804<br />

Outyear Construction Projects<br />

(dollars in thousands)<br />

<strong>FY</strong> 2013 <strong>FY</strong> 2014 <strong>FY</strong> 2015 <strong>FY</strong> 2016<br />

99-D-141-01, Pit Disassembly and Conversion (PDC) 315,000 321,000 277,000 317,000<br />

99-D-141-02, Waste Solidification Building (WSB) 0 0 0 0<br />

99-D-143, MOX Fuel Fabrication Facility 322,802 109,661 125,773 37,805<br />

Total, Construction 637,802 430,661 402,773 354,805<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

Capital Operating Expenses<br />

and Construction Summary Page 389<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget