7. Schedule <strong>of</strong> Appropriation Requests<br />

(dollars in thousands)<br />

Prior Years <strong>FY</strong> 2011 <strong>FY</strong> <strong>2012</strong> <strong>FY</strong> 2013 <strong>FY</strong> 2014 <strong>FY</strong> 2015 <strong>FY</strong> 2016 Outyears Total<br />

TEC 233,205 115,016 105,400 189,987 270,012 320,000 TBD TBD TBD<br />

OPC 75,030 24,179 TBD TBD TBD TBD TBD TBD TBD<br />

TPC 308,235 139,195 TBD TBD TBD TBD TBD TBD<br />

TEC 233,205 115,016 TBD TBD TBD TBD TBD TBD TBD<br />

OPC 76,234 25,000 TBD TBD TBD TBD TBD TBD TBD<br />

TPC 309,439 140,016 160,194 190,000 350,000 350,000 350,000 TBD TBD<br />

8. Related Operations and Maintenance Funding requirements<br />

Start <strong>of</strong> Operation or Beneficial Occupancy (fiscal quarter) TBD<br />

Expected Useful Life (number <strong>of</strong> years) 50<br />

Expected Future start <strong>of</strong> D&D for new construction (fiscal quarter) N/A<br />

(Related Funding requirements)<br />

A nnual Costs Life cycle costs<br />

Current<br />

Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Current<br />

Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Operations 1 38 138 6,900 6,900<br />

Maintenance 32 32 1,600 1,600<br />

Total, Operations & Maintenance 170 170 8,500 8,500<br />

9. Required D&D Information<br />

Area Square Feet<br />

Area <strong>of</strong> new construction 400,000<br />

Area <strong>of</strong> existing facility(s) being replaced<br />

0<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement 600,000<br />

<strong>The</strong> construction <strong>of</strong> UPF will add approximately 400,000 square feet <strong>of</strong> new facilities to the Y-12<br />

footprint and will replace functions in all or parts <strong>of</strong> the following facilities within the Y-12 Complex:<br />

Areas <strong>of</strong> Building 9212 that house EU casting and EU chemical processing operations;<br />

Areas <strong>of</strong> Building 9215 and 9998 that house EU metal working, EU machining operations and<br />

inspection, and<br />

Building 9204-2E which houses Assembly, Disassembly/ Dismantlement, Quality<br />

Evaluation and Product Certification operations.<br />

<strong>The</strong> final decontamination and decommissioning (D&D) and demolition <strong>of</strong> these areas are not<br />

considered a part <strong>of</strong> the UPF project.<br />

<strong>The</strong> D&D <strong>of</strong> Building 9212 is included in the Integrated Facility Disposition Project (IFDP) which is<br />

currently being proposed by the Environmental Management (EM) Program, DOE Oak Ridge<br />

Operations Office, Y-12 and Oak Ridge National Laboratory (ORNL) to dispose <strong>of</strong> legacy facilities at<br />

both Y-12 and the ORNL. Building 9215 and 9998 will not become immediately or completely excess<br />

Weapons Activities/RTBF/Construction/<br />

06-D-141, Uranium Processing Facility, Y-12 Page 223<br />