(i.e., conceptual, preliminary, and detailed). As a result, continued project and design efforts will be<br />

funded by both OPC and TEC funds in <strong>FY</strong> 2011, consistent with the level <strong>of</strong> design maturity <strong>of</strong> those<br />

facility systems and components. LANL will continue the associated D&T scope <strong>of</strong> the PDC<br />

technology. Subsequent to the approval <strong>of</strong> CD-1, the PDC Project design staff will be moved to the<br />

Savannah River Site in late <strong>FY</strong> 2011.<br />

<strong>The</strong> <strong>FY</strong> <strong>2012</strong> planned activities, based on the conceptual integrated plan, include: 1) continuing the<br />

S&P design to provide early feedstock for MOX and receiving required critical decision approvals;<br />

2) completing design and receiving required critical decision approvals for MS, which is the critical path<br />

for completion <strong>of</strong> the pit processing sub-project; 3) completing infrastructure design and receiving<br />

required critical decision approvals; and 4) continuing pit processing design. <strong>The</strong> pit processing design<br />

activities include plutonium glovebox and process systems, along with development <strong>of</strong> the balance-<strong>of</strong>plant<br />

systems including civil, structural, ventilation, electrical, water, fire, and security systems. LANL<br />

will continue the associated D&T scope <strong>of</strong> the PDC technology. When the S&P and MS critical<br />

decisions are approved, removal <strong>of</strong> existing equipment from the lower levels <strong>of</strong> the K-Building will<br />

commence, along with demolition and removal <strong>of</strong> existing infrastructure (piping, tanks, platforms,<br />

concrete, and electrical conduit) in the K-Area facility required to support S&P and MS construction in<br />

<strong>FY</strong> 2013. Additionally, initiation <strong>of</strong> long-lead procurement <strong>of</strong> equipment to support both S&P and<br />

MS may be required in <strong>FY</strong> <strong>2012</strong> to support the early MOX feed portion <strong>of</strong> the project. Stabilization and<br />

packaging equipment includes procurement <strong>of</strong> gloveboxes (shells and components, to include<br />

fabrication and assembly), calorimeters and standards, Waste Handling System Non-Destructive Assay<br />

(NDA), and Material Control and Accountability (MC&A) equipment. Material Storage equipment<br />

includes procurement <strong>of</strong> NDA and MC&A equipment (including a Californium Shuffler and<br />

components). Temporary infrastructure support activities (site preparation, roads, parking lots, lighting,<br />

and utilities for temporary facilities), as well as procurement and installation <strong>of</strong> equipment in the<br />

Project’s <strong>of</strong>fice trailer complex will begin in late <strong>FY</strong> <strong>2012</strong>.<br />

<strong>The</strong> PDC project is being conducted in accordance with the project management requirements in<br />

DOE O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all<br />

appropriate project management requirements have been met.<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-01, Pit Disassembly and<br />

Conversion <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 415