(dollars in thousands)<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

Laboratory/Utility/Office Building (RLUOB) is complete, and installation <strong>of</strong> associated equipment<br />

is underway and ahead <strong>of</strong> schedule. Following a series <strong>of</strong> cost reviews, the updated cost range<br />

estimate based on 45 percent design maturity for the CMRR Total Project Cost (TPC) is<br />

$3,700,000,000 to $5,800,000,000. This updated cost range estimate reflects bounding cost estimate<br />

data from the contractor and government contingency. Consistent with NNSA’s increased emphasis<br />

on project management rigor, baseline cost and schedule will not be finalized until the project<br />

achieves 90 percent design maturity. <strong>The</strong> project is scheduled to achieve 90 percent design maturity<br />

in <strong>FY</strong> <strong>2012</strong>, and the <strong>Department</strong> will set the performance baseline in <strong>FY</strong> 2013. <strong>The</strong> increased<br />

funding level in the <strong>FY</strong> <strong>2012</strong>-<strong>FY</strong> 2016 period is needed to support the required schedule <strong>of</strong><br />

construction completion in <strong>FY</strong> 2020 and a ramp-up to full operations by <strong>FY</strong> 2023. For <strong>FY</strong> <strong>2012</strong>, the<br />

amounts shown in the line item request for CMRR represent TPC, which includes both Construction<br />

and OPC. Construction and OPC funds will be executed through the line item. Funds will be<br />

obligated and recorded in the appropriate object classes (object class 32.0 and 25.4) as defined in<br />

Office <strong>of</strong> Management and Budget Circular A-11.<br />

<strong>The</strong> UPF at the Y-12 Complex will replace deteriorating 50-year-old facilities that do not meet<br />

current standards, are increasingly expensive to maintain, and are technologically obsolete. When<br />

complete, the UPF will allow a substantial reduction in the footprint <strong>of</strong> the secure area <strong>of</strong> the site<br />

and associated maintenance and security costs. <strong>The</strong> UPF will support the nation’s nuclear weapons<br />

stockpile, down blending <strong>of</strong> enriched uranium in support <strong>of</strong> nonproliferation, and provide uranium<br />

as feedstock for fuel for naval reactors. Following a series <strong>of</strong> cost reviews, the updated cost range<br />

estimate based on 45 percent design maturity for the UPF TPC is $4,200,000,000 to $6,500,000,000.<br />

This updated cost range estimate reflects bounding cost estimate data from the contractor,<br />

government contingency, and an independent cost estimate by the <strong>Department</strong>’s Office <strong>of</strong> Cost<br />

Analysis. Consistent with NNSA’s increased emphasis on project management rigor, baseline cost<br />

and schedule will not be finalized until the project achieves 90 percent design maturity. <strong>The</strong> project<br />

is scheduled to achieve 90 percent design maturity in <strong>FY</strong> <strong>2012</strong>, and the <strong>Department</strong> will set the<br />

performance baseline in <strong>FY</strong> 2013. <strong>The</strong> increased funding level in the <strong>FY</strong> <strong>2012</strong>- <strong>FY</strong> 2016 period is<br />

needed to support the NNSA’s priority to phase out operations in Building 9212 and move required<br />

chemical processing activities from Building 9212 into UPF in <strong>FY</strong> 2020, with a ramp-up to full<br />

operations in UPF by <strong>FY</strong> 2024. For <strong>FY</strong> <strong>2012</strong>, the amounts shown in the line item request for UPF<br />

represent TPC, which includes both Construction and OPC. Construction and OPC funds will be<br />

executed through the line item. Funds will be obligated and recorded in the appropriate object<br />

classes (object class 32.0 and 25.4) as defined in Office <strong>of</strong> Management and Budget Circular A-11.<br />

<strong>The</strong> Transuranic (TRU) Waste Facility Project at LANL will allow the site to comply with an Order<br />

<strong>of</strong> Consent with the State <strong>of</strong> New Mexico which requires the cleanup and vacating <strong>of</strong> Technical<br />

Area 54. <strong>The</strong> TRU Waste Facility will receive, process, and ship newly generated wastes to the<br />

Waste Isolation Pilot Plant (WIPP). <strong>The</strong> facility will support all nuclear operations at LANL that<br />

generate TRU waste.<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities Page 156<br />