02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

additional alternatives for disposition <strong>of</strong> certain non-pit plutonium materials currently in safe storage at<br />

the Savannah River Site (SRS) in South Carolina. In addition, DOE will analyze, in the SPD<br />

Supplemental EIS, the potential environmental impacts <strong>of</strong> using MOX fuel in up to five reactors owned<br />

by the Tennessee Valley Authority (TVA) at the Sequoyah (near Soddy-Daisy, TN) and Browns Ferry<br />

(near Athens, AL) nuclear stations. <strong>The</strong> TVA is a cooperating agency with DOE for preparation and<br />

review <strong>of</strong> the sections <strong>of</strong> the SPD Supplemental EIS that address operation <strong>of</strong> TVA reactors.<br />

Responding to the TVA stated interest in using MOX fuel assemblies in its three Browns Ferry Boiling<br />

Water Reactors (BWR), DOE is evaluating changes to the MOX facility design that will allow<br />

production <strong>of</strong> BWR MOX fuel in addition to the current MOX facility design for Pressurized Water<br />

Reactor (PWR) MOX fuel. Supplying BWR MOX fuel to the Browns Ferry BWR’s would account for<br />

50 percent <strong>of</strong> the MOX facility’s production. <strong>The</strong> design changes are straightforward and would be<br />

based on known designs from the French reference plant which currently is producing both BWR and<br />

PWR MOX fuel. <strong>The</strong> proposed changes will also allow the MOX program to produce and market MOX<br />

fuel based on the designs <strong>of</strong> several fuel vendors. <strong>The</strong> DOE is also evaluating a change to the MOX<br />

facility design to use depleted uranium feed material prepared using the latest “dry” fabrication process<br />

versus the baselined “wet” fabrication process. <strong>The</strong>se design modifications will be part <strong>of</strong> a project<br />

Baseline Change Proposal to be submitted in <strong>FY</strong> 2011.<br />

2. Design, Construction, and D&D Schedule<br />

(fiscal quarter or date)<br />

PED<br />

D&D<br />

CD-0 CD-1 Complete CD-2 CD-3 CD-4 D&D Start Complete<br />

<strong>FY</strong> 2000 N/A 2Q<strong>FY</strong>1999 4Q<strong>FY</strong>2001 N/A 1Q<strong>FY</strong>2002 4Q<strong>FY</strong>2005 N/A N/A<br />

<strong>FY</strong> 2001 N/A 2Q<strong>FY</strong>1999 3Q<strong>FY</strong>2002 N/A 4Q<strong>FY</strong>2002 1Q<strong>FY</strong>2006 N/A N/A<br />

<strong>FY</strong> 2002 N/A 2Q<strong>FY</strong>1999 4Q<strong>FY</strong>2002 N/A 2Q<strong>FY</strong>2003 1Q<strong>FY</strong>2007 N/A N/A<br />

<strong>FY</strong> 2003 N/A 2Q<strong>FY</strong>1999 4Q<strong>FY</strong>2003 N/A 2Q<strong>FY</strong>2004 4Q<strong>FY</strong>2007 N/A N/A<br />

<strong>FY</strong> 2004 N/A 2Q<strong>FY</strong>1999 1Q<strong>FY</strong>2004 N/A 2Q<strong>FY</strong>2004 4Q<strong>FY</strong>2007 N/A N/A<br />

<strong>FY</strong> 2005 N/A 2Q<strong>FY</strong>1999 3Q<strong>FY</strong>2004 N/A 3Q<strong>FY</strong>2005 2Q<strong>FY</strong>2009 N/A N/A<br />

<strong>FY</strong> 2006 N/A 2Q<strong>FY</strong>1999 1Q<strong>FY</strong>2005 N/A 3Q<strong>FY</strong>2005 TBD N/A N/A<br />

<strong>FY</strong> 2007 N/A 2Q<strong>FY</strong>1999 4Q<strong>FY</strong>2009 N/A 2Q<strong>FY</strong>2007 4Q<strong>FY</strong>2014 N/A N/A<br />

<strong>FY</strong> 2008<br />

<strong>FY</strong> 2009<br />

1Q<strong>FY</strong>1997 2<br />

1Q<strong>FY</strong>1997<br />

Q<strong>FY</strong>1999<br />

03/22/1999<br />

2Q<strong>FY</strong>2011 2<br />

2Q<strong>FY</strong>2013<br />

Q<strong>FY</strong>2007 2Q<strong>FY</strong>2007 4Q<strong>FY</strong>2013 N/A N/A<br />

a<br />

04/11/2007 4/11/07 b<br />

4Q<strong>FY</strong>2016 N /A N/A<br />

<strong>FY</strong> 2010 1Q<strong>FY</strong>1997 03/22/1999 2Q<strong>FY</strong>2013 04/11/2007 4/11/07 1Q<strong>FY</strong>2017 N/A N/A<br />

<strong>FY</strong> 2011 1Q<strong>FY</strong>1997 03/22/1999 2Q<strong>FY</strong>2013 04/11/2007 4/11/07 1Q<strong>FY</strong>2017 N/A N/A<br />

<strong>FY</strong> <strong>2012</strong> 1Q<strong>FY</strong>1997 03/22/1999 2Q<strong>FY</strong>2013 04/11/2007 4/11/07 1Q<strong>FY</strong>2017 N/A N/A<br />

CD-0 – Approve Mission Need<br />

CD-1 – Approve Alternative Selection and Cost Range<br />

CD-2 – Approve Performance Baseline<br />

CD-3 – Approve Start <strong>of</strong> Construction<br />

a<br />

Facility and process design were (confirm) completed in <strong>FY</strong> 2010, the equipment design will be completed in <strong>FY</strong> 2011 and<br />

the s<strong>of</strong>tware design will be completed in <strong>FY</strong> 2013.<br />

b <strong>The</strong> <strong>Department</strong> approved CD-3 (Start <strong>of</strong> Construction) on April 11, 2007, however, as directed by the Revised Continuing<br />

Resolution, 2007, Public Law 110-5, construction began on August 1, 2007.<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-143, Mixed Oxide (MOX)<br />

Fuel Fabrication Facility Page 392<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!