7. Schedule <strong>of</strong> Appropriation Requests<br />

(dollars in thousands)<br />

Prior Years <strong>FY</strong> 2011 <strong>FY</strong> <strong>2012</strong> <strong>FY</strong> 2013 <strong>FY</strong> 2014 <strong>FY</strong> 2015 <strong>FY</strong> 2016 Outyears Total<br />

<strong>FY</strong> 2011 TEC 13,684 20,000 19,640 20,221 20,468 42,480 TBD TBD TBD<br />

OPC 6,088 3,300 2,800 2,600 TBD TBD TBD TBD TBD<br />

TPC 19,772 23,300 22,440 22,821 20,468 42,480 TBD TBD TBD<br />

TEC 14,684 20,000 19,402 8,889 8,624 12,500 0 0 84,099<br />

<strong>FY</strong> <strong>2012</strong> OPC 5,505 685 2,100 1,500 2,577 2,200 910 0 15,477<br />

TPC 20,189 20,685 21,502 10,389 11,201 14,700 910 0 99,576<br />

8. Related Operations and Maintenance Funding Requirements<br />

Start <strong>of</strong> Operation or Beneficial Occupancy (fiscal quarter or date) TBD<br />

Expected Useful Life (number <strong>of</strong> years) 25<br />

Expected Future Start <strong>of</strong> D&D <strong>of</strong> this capital asset (fiscal quarter) TBD<br />

(Related Funding requirements)<br />

(dollars in thousands)<br />

Current<br />

Total<br />

Estimate<br />

Annual Costs Life Cycle Costs<br />

Previous<br />

Total<br />

Estimate<br />

Current<br />

Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Operations N/A N/A N/A N/A<br />

Maintenance N/A N/A N/A N/A<br />

Total, Operations & Maintenance N/A N/A N/A N/A<br />

9. Required D&D Information<br />

As the project is an investment in the infrastructure systems <strong>of</strong> an existing facility, construction and<br />

demolition activities are minimal and are directly related to replacement and upgrade <strong>of</strong> these systems.<br />

Area Square Feet<br />

Area <strong>of</strong> new construction 1,200<br />

Area <strong>of</strong> existing facility(s) being replaced N/A<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement 1,200<br />

Name(s) and site location(s) <strong>of</strong> existing facility(s) to be replaced: Uninterruptible Power Supply is<br />

planned to be relocated immediately outside <strong>of</strong> the existing structure (this represents the 1,200 square<br />

feet).<br />

10. Acquisition Approach<br />

Design and Construction Management will be implemented by Los Alamos National Security, LLC<br />

through the LANL Management and Operating Contract. <strong>The</strong> TRP Acquisition Strategy is based on<br />

tailored procurement strategies for each subproject in order to mitigate risks. <strong>The</strong> TRP subprojects will<br />

be implemented via LANL-issued final design/construction contracts based on detailed performance<br />

requirements/specifications developed during the preliminary design phase.<br />

Weapons Activities/RTBF/Construction/<br />

11-D-801, TA-55 Reinvestment Project II, LANL Page 183<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget