02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

(dollars in thousands)<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

• Develop an Environmental Impact Statement (EIS) as required by the National<br />

Environmental Policy Act (NEPA).<br />

• Evaluate and develop an optimized product flow for spent nuclear fuel management (i.e.,<br />

receipt, inspection, preparation and packaging, and long-term storage).<br />

• Determine the most efficient, safe, and cost effective location for the new facility.<br />

• Develop conceptual specifications for equipment, facility layout, and spent fuel handling<br />

systems.<br />

• Perform requisite project management, acquisition management, and work flow using an<br />

Engineering, Procurement, Construction Management (EPCM) contractor.<br />

• Approve Critical Decision 1, “Approve Alternative Selection and Preliminary Baseline”.<br />

This process involves decontaminating to minimize the environmental, health, and safety<br />

impact <strong>of</strong> contaminated facilities, with the benefit <strong>of</strong> making radiological<br />

Advanced Test Reactor Operations and Test<br />

Support 61,800 63,100 64,300<br />

Naval Reactors performs irradiation testing at the Advanced Test Reactor in support <strong>of</strong> advanced<br />

reactor design development. While ATR is a facility primarily funded by the Office <strong>of</strong> Nuclear<br />

<strong>Energy</strong> and operated by their contractor, NR funds a portion <strong>of</strong> the cost <strong>of</strong> base operations <strong>of</strong> the<br />

ATR, as well as NR specific testing.<br />

Facility Operations 48,200 44,186 51,558<br />

Facility Operations funding supports general plant projects (GPP) and capital equipment<br />

procurements.<br />

Total, Naval Reactors Operations and<br />

Maintenance 877,533 997,886 1,069,262<br />

Naval Reactors/<br />

Operations and Maintenance<br />

Page 457<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!