Phase B: Staging and Characterization Facilities Scope<br />

<strong>The</strong> scope involves the design, construction, and installation <strong>of</strong> facilities to ship newly generated TRU<br />

waste to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. It does not provide for the<br />

processing and shipping <strong>of</strong> legacy waste. <strong>The</strong> facilities are part <strong>of</strong> a comprehensive, long-term strategy<br />

to consolidate radioactive waste operations into a smaller, more compact area that can operate safely,<br />

securely, and effectively for the foreseeable future. <strong>The</strong> facility is currently designated as a hazard<br />

category 2 nuclear facility, seismic design category 2. <strong>The</strong> facility will be sized to stage/store up to<br />

1,240 plutonium equivalent drums <strong>of</strong> waste; stacked three high, if and when necessary. <strong>The</strong> facility’s<br />

sizing is based on the assumption <strong>of</strong> up to nine months storage from generation to WIPP shipment, TRU<br />

storage area for the current DP and non-DP projected generation rates, current processing throughput<br />

rate <strong>of</strong> 75 percent facility/equipment availability and limited storage <strong>of</strong> oversize TRU containers.<br />

<strong>FY</strong> <strong>2012</strong> activities include RCRA permit applications and the start <strong>of</strong> the final design.<br />

<strong>The</strong> project is being conducted in accordance with the project management requirements in DOE<br />

O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all appropriate<br />

project management requirements have been met.<br />

Funds appropriated under this data sheet may be used to provide independent assessments <strong>of</strong> the<br />

planning and execution <strong>of</strong> this project commissioned by federal staff.<br />

Total Estimated Cost (TEC)<br />

PED (07-D-140-02)<br />

5. Financial Schedule<br />

(dollars in thousands)<br />

App ropriations Obligations Costs<br />

<strong>FY</strong> 2007 0 0 0<br />

<strong>FY</strong> 2008 2,452 0 0<br />

<strong>FY</strong> 2009 7,223 0 0<br />

<strong>FY</strong> 2010 0 9,312 408<br />

<strong>FY</strong> 2011 5,000 5,363 11,332<br />

<strong>FY</strong> <strong>2012</strong> 3,518 3,518 4,776<br />

<strong>FY</strong> 2013 0 0 1,677<br />

Total, PED (07-D-140-02) 18,193 18,193 18,193<br />

Construction<br />

<strong>FY</strong> <strong>2012</strong> 9,881 9,881 6,467<br />

<strong>FY</strong> 2013 12,349 12,349 7,399<br />

<strong>FY</strong> 2014 71,151 71,151 TBD<br />

<strong>FY</strong> 2015 12,426 12,426 TBD<br />

<strong>FY</strong> 2016 TBD TBD TBD<br />

<strong>FY</strong> 2017 TBD TBD TBD<br />

Total, Construction TBD TBD TBD<br />

Weapons Activities/RTBF/Construction/<br />

12-D-301, TRU Waste Facility Project,<br />

LANL <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 169