3. Baseline and Validation Status<br />

TEC, TEC,<br />

(dollars in thousands)<br />

OPC OPC,<br />

PED Construction TEC, Total Except D&D D&D OPC, Total TPC<br />

<strong>FY</strong> 2008 8,146 68,140 76,286 4,292 N/A 4,292 80,578<br />

<strong>FY</strong> 2009 8,146 72,334 80,480 4,507 N/A 4,507 84,987<br />

<strong>FY</strong> 2011 7,948 a 125,972 13 3,920 4,292 N/A 4,292 138,212<br />

<strong>FY</strong> <strong>2012</strong> 7,948 134,217 142,165 4,540 N/A 4,540 14 6,705<br />

4. Project Description, Justification, and Scope<br />

This project will provide a new high explosive (HE) main charge pressing facility with capability and<br />

capacity to meet the needs <strong>of</strong> changing weapon complexity, projected workload, and the Life Extension<br />

Program activities in the future including the W76, W78, and W88 Programs.<br />

<strong>The</strong> facility improves safety, quality and efficiency <strong>of</strong> material movement. It reduces personnel<br />

restrictions and eliminates human reliability program (HRP) requirements by its location outside the<br />

Protected Area. Benefits also include reduced administrative safety controls through improved<br />

engineering controls, and reduced maintenance downtime.<br />

<strong>The</strong> new facility will be located in the Limited Area <strong>of</strong> the Pantex Plant, and replaces existing operations<br />

in buildings 12-17, 12-21A and 12-63. <strong>The</strong> facility will be designed to produce main charge pressing<br />

hemispheres to meet future capacity requirements and will consist <strong>of</strong> approximately 45,000 square feet<br />

<strong>of</strong> space. Proposed areas include the main pressing facility, a magazine storage area, and a connecting<br />

ramp.<br />

<strong>The</strong> <strong>FY</strong> <strong>2012</strong> activities include the continuation <strong>of</strong> construction work initiated in <strong>FY</strong> 2011. This work<br />

will include the placement <strong>of</strong> reinforcement steel and concrete as well as the procurement and<br />

manufacture <strong>of</strong> long lead equipment such as blast-doors, frames, and isostatic presses.<br />

<strong>The</strong> project is being conducted in accordance with the project management requirements in<br />

DOE O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all<br />

appropriate project management requirements have been met.<br />

Funds appropriated under this data sheet may be used to provide independent assessments <strong>of</strong> the<br />

planning and execution <strong>of</strong> this project.<br />

a PED reduced due to the loss <strong>of</strong> all uncosted project funds included in the <strong>FY</strong> 2010 use <strong>of</strong> prior year balances <strong>of</strong>fset.<br />

Weapons Activities/RTBF/Construction/<br />

08-D-802, HE Pressing Facility, PX Page 202<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget