9. Required D&D Information<br />

Area Square Feet<br />

Area <strong>of</strong> new construction<br />

10,000 – 16,000<br />

Area <strong>of</strong> existing facility(s) being replaced<br />

TBD<br />

Area <strong>of</strong> additional D&D space to meet the “one-for-one” requirement None<br />

Name(s) and site location(s) <strong>of</strong> existing facility(s) to be replaced: TA-54 Disposal Area G. Cost for this<br />

disposal is not the responsibility <strong>of</strong> the National Nuclear Security Administration and will be paid by the<br />

Office <strong>of</strong> Environmental Management (EM) Program. Area G cost will be part <strong>of</strong> the EM budget and<br />

responsibility.<br />

10. Acquisition Approach<br />

<strong>The</strong> project will be executed in two phases. Phase A will provide Site and Infrastructure Improvements<br />

and will be executed through a firm-fixed price design-bid-build contract. Phase B will provide the<br />

Staging and Characterization Facilities and will be executed through firm-fixed price design-bid-build<br />

contract. <strong>The</strong> Management and Operating contractor will provide project, design, and construction<br />

management oversight and procure the design and construction services.<br />

Weapons Activities/RTBF/Construction/<br />

12-D-301, TRU Waste Facility Project,<br />

LANL <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />

Page 173