Stockpile Systems<br />

B61 Stockpile Systems<br />

<strong>FY</strong> <strong>2012</strong> vs.<br />

<strong>FY</strong> 2011<br />

Request<br />

($000)<br />

<strong>The</strong> decrease results primarily from moving the B61 LES activities to<br />

the LEP in anticipation <strong>of</strong> NWC approval <strong>of</strong> B61 Phase 6.3<br />

Development Engineering. <strong>The</strong> approval will complete the LES and<br />

enable a transfer <strong>of</strong> requirements to the B61 LEP funding line. <strong>The</strong><br />

remaining B61 life extension activity decrease results from the<br />

reallocation <strong>of</strong> funds to the Readiness Campaign to address production<br />

readiness requirements. Within the overall B61 decrease, there is a<br />

B61 system sustainment increase <strong>of</strong> $6,901,000 which represents<br />

funding for design activities in <strong>FY</strong> <strong>2012</strong> to replace the joint test<br />

assembly flight recorder instrumentation and weapon evaluation test<br />

laboratory system tester. -244,740<br />

W76 Stockpile Systems<br />

<strong>The</strong> decrease results from reduced production <strong>of</strong> the 1X Acorn Gas<br />

Transfer Systems and the MC4380A Neutron Generators. This is<br />

consistent with production schedule requirements. -1,138<br />

W78 Stockpile Systems<br />

<strong>The</strong> net increase consists <strong>of</strong> a decrease in NG production consistent<br />

with USSTRATCOM operational requirements; and an increase for<br />

the W78 LES which represents the beginning <strong>of</strong> the feasibility<br />

study/option down-select (Phase 6.2/6.2a) process. +23,620<br />

W80 Stockpile Systems<br />

<strong>The</strong> increase funds the NG subassembly, timer driver development<br />

lots, system qualification and transportation testing, and design,<br />

development, and production <strong>of</strong> timers, detonators and NGs at Sandia<br />

National Laboratories. This enables FPU in <strong>FY</strong> 2014. +10,251<br />

Weapons Activities/<br />

Directed Stockpile Work Page 76<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget