07-D-220, Radioactive<br />

Liquid Waste Treatment<br />

Facility Upgrade, LANL a<br />

Total<br />

Estimated<br />

Cost (TEC)<br />

Prior-Year<br />

Appropriations<br />

<strong>FY</strong> 2010<br />

Actual<br />

Approp<br />

<strong>FY</strong> 2011<br />

Request<br />

<strong>FY</strong> <strong>2012</strong><br />

Request<br />

Unappropriated<br />

Balance<br />

TBD 10,000 0 0 0 TBD<br />

07-D-140, Project<br />

Engineering & Design,<br />

VL 18,193 9,675 0 5,000 3,518 0<br />

06-D-402, NTS Replace<br />

Fire Stations No. 1 and<br />

No. 2, NTS 36,744 35,271 1,473 0 0 0<br />

06-D-141,<br />

PED/Construction,<br />

Uranium Processing<br />

Facility, Y-12 TBD 0 94,000 115,016 160,194 TBD<br />

06-D-140, Project<br />

Engineering & Design,<br />

VL b<br />

(dollars in thousands)<br />

192,929 176,929 12,000 4,000 0 0<br />

04-D-128, Criticality<br />

Experiments Facility<br />

(formerly TA-18 Mission<br />

Relocation Project),<br />

LANL/NTS 81,269 79,769 1,500 0 0 0<br />

04-D-125, Chemistry and<br />

Metallurgy Research<br />

Facility Replacement<br />

(CMRR), LANL TBD 328,832 97,000 225,000 300,000 TBD<br />

99-D-141-01, Pit<br />

Disassembly and<br />

Conversion Facility<br />

(PDCF), SRS c<br />

TBD 280,441 30,321 0 0 0<br />

Total, Construction<br />

_________________________<br />

283,904 399,016 620,510<br />

a<br />

$30,332 in prior year appropriations are proposed to be used as <strong>of</strong>fsets for other DOE programs in <strong>FY</strong> <strong>2012</strong>. Future funding<br />

requirements for RLWTF are yet to be determined.<br />

b<br />

Funding for the Uranium Processing Facility (UPF), Y-12 in <strong>FY</strong> 2010 and beyond is provided under 06-D-141. Funding in<br />

the amount <strong>of</strong> $139,205 was provided under 06-D-140, Project Engineering and Design, LV in prior years for UPF.<br />

c<br />

Funding in <strong>FY</strong> 2011 and beyond is requested under the Defense Nuclear Nonproliferation/Fissile Materials Disposition<br />

Program.<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities<br />

Capital Operating Expenses<br />

and Construction Summary Page 164<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!