09-D-404, Test Capabilities Revitalization-Phase II Project<br />

Sandia National Laboratories, New Mexico<br />

Project Data Sheet (PDS) is for Construction<br />

1. Significant Changes<br />

<strong>The</strong> most recent DOE O 413.3B approved Critical Decision (CD) is CD-3, Approve Start <strong>of</strong><br />

Construction, approved September 10, 2008, with a Total Project Cost (TPC) <strong>of</strong> $52,705 and CD-4 <strong>of</strong><br />

fourth quarter <strong>of</strong> Fiscal Year (<strong>FY</strong>) 2013.<br />

This project has a proposed Baseline Change Proposal (BCP) with a TPC <strong>of</strong> $57,809. As a result, the<br />

funding pr<strong>of</strong>ile for this project is not fully funded. Additionally, funding may be requested in <strong>FY</strong> 2013<br />

once the BCP is approved.<br />

A Federal Project Director at the appropriate certification level has been assigned to this project.<br />

This PDS is an update <strong>of</strong> <strong>FY</strong> 2009 PDS.<br />

2. Design, Construction, and D&D Schedule<br />

CD-0 CD-1<br />

PED<br />

Complete CD-2<br />

(fiscal quarter or date)<br />

CD-3 CD-4 D&D Start<br />

D&D<br />

Complete<br />

<strong>FY</strong> 2009 07/03/2001 05/27/2005 3Q<strong>FY</strong>2008 4Q<strong>FY</strong>2008 4Q<strong>FY</strong>2008 4Q<strong>FY</strong>2013 3Q<strong>FY</strong>2010 4Q<strong>FY</strong>2011<br />

<strong>FY</strong> <strong>2012</strong> 07/03/2001 5/27/2005 6 /30/2008 9 /10/2008 9/10/2008 9/30/2013 3Q<strong>FY</strong>2010 4Q<strong>FY</strong><strong>2012</strong><br />

CD-0 – Approve Mission Need<br />

CD-1 – Approve Alternative Selection and Cost Range<br />

CD-2 – Approve Performance Baseline<br />

CD-3 – Approve Start <strong>of</strong> Construction<br />

CD-4 – Approve Start <strong>of</strong> Operations or Project Closeout<br />

D&D Start – Start <strong>of</strong> Demolition & Decontamination (D&D) work<br />

D&D Complete –Completion <strong>of</strong> D&D work<br />

(fiscal year or quarter)<br />

CD-3A<br />

<strong>FY</strong> 2009 11/30/2007<br />

CD-3A: Procure long-lead services for machining the gas gun and the 12-inch actuator for the<br />

Mechanical Shock Facility<br />

Weapons Activities/RTBF/Construction<br />

09-D-404, Test Capabilities Revitalization-Phase II, SNL Page 193<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!