02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Received an R&D 100 award from R&D magazine, for LANL research activities that led to<br />

the development <strong>of</strong> a new way to make a type <strong>of</strong> explosive that is both insensitive and<br />

environmentally friendly.<br />

• Accomplished significant progress in the area <strong>of</strong> static high pressure including: measurement<br />

<strong>of</strong> the strength <strong>of</strong> vanadium up to pressures approaching a megabar, studies <strong>of</strong> thermal effects<br />

on the EOS <strong>of</strong> plutonium at moderate pressures, measurement <strong>of</strong> the melt curve <strong>of</strong> tin using<br />

designer anvil resistive heating and conductivity diagnostic, and measurements <strong>of</strong> the EOS<br />

change in plutonium due to artificial aging.<br />

• Made progress preparing for the first plutonium shot on the refurbished Z; the shot was made<br />

November 18, 2010.<br />

• Provided a significant body <strong>of</strong> experimental data using Z on materials <strong>of</strong> interest, including the<br />

strength <strong>of</strong> beryllium and tantalum.<br />

Advanced Radiography<br />

• Published Bayesian Interference Engine (BIE) analysis <strong>of</strong> scatter rejection <strong>of</strong> DARHT I<br />

“Bucky grid” and completed BIE analysis <strong>of</strong> DARHT I error propagation.<br />

• Built and installed four out <strong>of</strong> five-camera array for DARHT II. <strong>The</strong> first camera was fielded<br />

on the first dual axis hydro at DARHT.<br />

• Utilized the first module <strong>of</strong> the continuous imager (MOXIE) on a pRad experiment. This<br />

device won a R&D 100 award from R&D Magazine in <strong>FY</strong> 2010.<br />

• Maintained operational readiness <strong>of</strong> the Cygnus radiographic system and optimized the VISAR<br />

(Velocity Interferometer System for Any Reflector) diagnostics by reducing the noise and increasing<br />

the light efficiency by a factor <strong>of</strong> three.<br />

Secondary Assessment Technologies<br />

• Executed the first NIF experiments for the stockpile stewardship mission.<br />

• Demonstrated the ability to calculate system output with Uncertainty Quantification within<br />

predefined ranges <strong>of</strong> data.<br />

• Conducted four joint experiments on Z to provide data in support <strong>of</strong> a major energy balance<br />

milestone.<br />

• Resolved, by working in a collaborative effort between LLNL and LANL, a long-standing<br />

discrepancy in simulations <strong>of</strong> secondary performance. This resolution provides the basis for future<br />

LEP options and improves confidence in stockpile assessments.<br />

Major Outyear Priorities and Assumptions<br />

<strong>The</strong> outyear requirements for the Science Campaign total $1,632,912,000 for <strong>FY</strong> 2013 through <strong>FY</strong> 2016.<br />

<strong>The</strong> Science Campaign will improve predictive capability by <strong>FY</strong> 2020. <strong>The</strong> major steps on this path<br />

include: fundamental multi-phase Pu EOS and constitutive properties models for primary implosions by<br />

<strong>FY</strong> <strong>2012</strong>; models for full primary operation by <strong>FY</strong> 2015; and models <strong>of</strong> full secondary performance by<br />

<strong>FY</strong> 2018. Current outyear projections for Advanced Certification are based on present understanding <strong>of</strong><br />

future stockpile certification needs. This is particularly focused on developing methodologies and data<br />

for certification <strong>of</strong> improved surety options. This effort will require additional subcritical experiments.<br />

Weapons Activities/<br />

Science Campaign Page 85<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!