07-D-140 Project Engineering and Design (PED),<br />

Various Locations<br />

Project Data Sheet (PDS) is for PED (multiple projects)<br />

1. Significant Changes<br />

DOE O 413.3B allows NNSA to request PED funds for use in preliminary design, final design and<br />

baseline development. This data sheet currently only contains funds for Transuranic (TRU) Waste<br />

Facility Project. <strong>The</strong> approved Critical Decision (CD) for the TRU Waste Facility Project is CD-1,<br />

Approve Alternative Selection and Cost Range that was approved on August 10, 2010, with a<br />

preliminary cost range <strong>of</strong> $71,000 to $124,000 and CD-4 range <strong>of</strong> <strong>FY</strong> 2015 to <strong>FY</strong> 2018. CD-1 approval<br />

provides the authorization to begin the use <strong>of</strong> PED funds for the project Execution Phase.<br />

A Federal Project Director at the appropriate level has been assigned to the TRU Waste Facility project.<br />

This PDS is an update <strong>of</strong> the <strong>FY</strong> 2011 PED PDS.<br />

Agreements on the planning assumptions and final project requirements were reached in the second<br />

Quarter <strong>of</strong> <strong>FY</strong> 2010 resulting in an additional <strong>FY</strong> <strong>2012</strong> PED request.<br />

2. Design, Construction, and D&D Schedule<br />

(fiscal quarter or date)<br />

CD-0 a <strong>FY</strong> 2007<br />

<strong>FY</strong> 2008<br />

<strong>FY</strong> 2009<br />

02/07/2006<br />

02/07/2006<br />

02/07/2006<br />

CD-1<br />

2Q<strong>FY</strong> 2007<br />

2Q<strong>FY</strong> 2007<br />

1Q <strong>FY</strong> 2008<br />

PED<br />

Complete CD-2<br />

4Q <strong>FY</strong> 2008 Various<br />

4Q <strong>FY</strong> 2008 Various<br />

4Q <strong>FY</strong> 2009 TBD<br />

CD-3<br />

Various<br />

Various<br />

TBD<br />

CD-4<br />

Various<br />

Various<br />

TBD<br />

D&D<br />

Start<br />

Various<br />

Various<br />

TBD<br />

D&D<br />

Complete<br />

Various<br />

Various<br />

TBD<br />

<strong>FY</strong> 2010 02/07/2006 1Q <strong>FY</strong> 2009 TBD TBD TBD TBD TBD TBD<br />

<strong>FY</strong> 2011<br />

<strong>FY</strong> <strong>2012</strong><br />

02/07/2006<br />

02/07/2006 0<br />

3Q <strong>FY</strong> 2010<br />

8/10/2010<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

TBD TBD TBD TBD<br />

b TBD TBD TBD TBD<br />

CD-0 – Approve Mission Need<br />

CD-1 – Approve Alternative Selection and Cost Range<br />

CD-2 – Approve Performance Baseline<br />

CD-3 – Approve Start <strong>of</strong> Construction<br />

CD-4 – Approve Start <strong>of</strong> Operations or Project Closeout<br />

D&D Start – Start <strong>of</strong> Demolition & Decontamination (D&D) work<br />

D&D Complete – Completion <strong>of</strong> D&D work<br />

a Pertains to the TRU Waste CD-0 date only.<br />

b Schedules are to be determined. Preliminary CD-4 schedule range is 4Q <strong>FY</strong> 2015 to 3Q <strong>FY</strong> 2018.<br />

Weapons Activities/RTBF/Construction/<br />

07-D-140, Project Engineering and Design, VL<br />

Page 209<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget