A Fire Water tie-in line to the HEUMF will also be provided. Systems will be provided to<br />

accommodate the transfer <strong>of</strong> nuclear and non-nuclear materials between UPF and other Y-12 facilities.<br />

<strong>The</strong> project will be conducted in accordance with the project management requirements in DOE<br />

O 413.3B, Program and Project Management for the Acquisition <strong>of</strong> Capital Assets, and all appropriate<br />

project management requirements have been met.<br />

Funds appropriated under this data sheet may be used for independent assessments <strong>of</strong> the planning and<br />

execution <strong>of</strong> this project.<br />

<strong>The</strong> <strong>FY</strong> 2011 and <strong>FY</strong> <strong>2012</strong> activities include ongoing design activities for the facility and associated<br />

services and equipment. As part <strong>of</strong> the project planning activities, the project will be awarding multiple<br />

CD-2 and CD-3 packages, possibly as early as <strong>FY</strong> 2011, for smaller, more manageable, subprojects to<br />

manage commitments for cost and schedule. <strong>The</strong> initial activities may include long-lead procurement <strong>of</strong><br />

a number <strong>of</strong> specialty systems and components which involve equipment manufacturer design. Also,<br />

early start <strong>of</strong> site preparation and site utilities may be sought. No funding will be used for these<br />

purposes until a subproject performance baseline has been validated and the appropriate milestone in<br />

accordance with DOE O 413.3B has been approved.<br />

5. Financial Schedule<br />

(dollars in thousands)<br />

App ropriations Obligations Costs<br />

Total Estimated Cost (TEC)<br />

PED a<br />

<strong>FY</strong> 2006 5,000 5,000 0<br />

<strong>FY</strong> 2007 5,000 5,000 677<br />

<strong>FY</strong> 2008 38,583 38,583 33,950<br />

<strong>FY</strong> 2009 90,622 b 90,622 7 9,184<br />

<strong>FY</strong> 2010 94,000 94,000 80,959<br />

<strong>FY</strong> 2011 115,016 115,016 127,000<br />

<strong>FY</strong> <strong>2012</strong> TBD TBD TBD<br />

<strong>FY</strong> 2013 TBD TBD TBD<br />

<strong>FY</strong> 2014 0 0 0<br />

Total, PED TBD TBD TBD<br />

Construction<br />

<strong>FY</strong> <strong>2012</strong> TBD TBD TBD<br />

<strong>FY</strong> 2013 TBD TBD TBD<br />

<strong>FY</strong> 2014 TBD TBD TBD<br />

<strong>FY</strong> 2015 TBD TBD TBD<br />

<strong>FY</strong> 2016 TBD TBD TBD<br />

<strong>FY</strong> 2017 TBD TBD TBD<br />

Total, Construction TBD TBD TBD<br />

a PED for <strong>FY</strong> 2006 – <strong>FY</strong> 2009 was appropriated under 06-D-140, Project Engineering & Design, VL.<br />

b<br />

$2,654 was realigned within 06-D-140, PED, VL from the UPF subproject to the Radioactive Liquid Waste Treatment<br />

Facility Upgrade subproject, in <strong>FY</strong> 2009.<br />

Weapons Activities/RTBF/Construction/<br />

06-D-141, Uranium Processing Facility, Y-12 Page 220<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget