07-01: Consolidate and Renovate Computing Facilities, Kansas City Plant, Kansas City<br />

A-E Work<br />

Initiated<br />

Fiscal Year Appropriations ($000) Obligations ($000) Costs ($000)<br />

2007 0 0 0<br />

This project has been cancelled.<br />

07-02: TRU Waste Facility, Los Alamos National Laboratory<br />

A-E Work<br />

Initiated<br />

A-E Work<br />

Completed<br />

A-E Work<br />

Completed<br />

Fiscal Quarter<br />

Fiscal Quarter<br />

Physical<br />

Construction<br />

Start<br />

Physical<br />

Construction Start<br />

3Q <strong>FY</strong> 2010 TBD TBD<br />

Physical<br />

Construction<br />

Complete<br />

Physical<br />

Construction<br />

Complete<br />

Total Estimated<br />

Cost (Design<br />

Only) ($000)<br />

Total<br />

Estimated<br />

Cost (Design<br />

Only) ($000)<br />

Preliminary Full<br />

Total Estimated<br />

Projection<br />

($000)<br />

2Q <strong>FY</strong> 2007 1Q <strong>FY</strong> 2008 2Q <strong>FY</strong> 2008 2Q <strong>FY</strong> 2011 1,977 22,200 – 27,000<br />

Preliminary Full<br />

Total Estimated<br />

Cost Projection<br />

($000)<br />

<strong>FY</strong>2015 –<br />

<strong>FY</strong>2018 18,193 71,000 – 124,000<br />

Fiscal Year Appropriations Obligations Costs<br />

2007 0<br />

2008 2,452<br />

0 0<br />

a<br />

0 0<br />

2009 7 ,223 0 0<br />

2010 0 9,312 408<br />

2011 5<br />

<strong>2012</strong><br />

,000<br />

3,518<br />

5,363 11,332<br />

b<br />

3,518 4, 776<br />

2013 0 0 1,677<br />

<strong>The</strong> <strong>Department</strong> <strong>of</strong> <strong>Energy</strong> (DOE) signed an Order <strong>of</strong> Consent (“Consent Order”) with the State <strong>of</strong><br />

New Mexico, effective March 1, 2005. <strong>The</strong> Consent Order requires DOE to complete a “Fence-to-<br />

Fence” cleanup <strong>of</strong> Los Alamos National Laboratory (LANL) by December 29, 2015. “Fence-to-Fence”<br />

means removal and/or remediation <strong>of</strong> contaminants that reside in the environment at LANL. As part <strong>of</strong><br />

the Consent Order, the State <strong>of</strong> New Mexico has identified four Material Disposal Areas (MDAs) in<br />

TA-54. <strong>The</strong> current set <strong>of</strong> TRU waste storage and process facilities resides in MDA G. <strong>The</strong> MDA G<br />

a<br />

Original <strong>FY</strong> 2008 appropriation was $2,474. This was reduced by $22 as a result <strong>of</strong> a mandatory rescission in the <strong>FY</strong> 2008<br />

Consolidated Appropriations Act (P.L. 110-161).<br />

b <strong>FY</strong> <strong>2012</strong> funding request is for Phase B <strong>of</strong> the project. <strong>The</strong> Project will be executed in two phases; Phase A will be for<br />

Infrastructure and Site Improvements. Phase B is for Staging and Characterization Facilities. Further descriptions <strong>of</strong> the two<br />

phases are provided in 12-D-301. Phase A design is expected to be completed in 4th Quarter <strong>FY</strong> 2011 therefore, no additional<br />

funds is needed.<br />

Weapons Activities/RTBF/Construction/<br />

07-D-140, Project Engineering and Design, VL<br />

Page 211<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget