Total Estimated Cost (TEC)<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

Current Total<br />

Estimate<br />

(dollars in thousands)<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Design (PED)<br />

Design 6 ,035 10,500 6,035<br />

Contingency 62 0 2,000 620<br />

Total, PED 6,655 12,500 6,655<br />

Construction<br />

Site Preparation N/A N/A N/A<br />

Equipment N/ A N/A N/A<br />

Other Construction 47,571 53,296 47,571<br />

Contingency 1 1,570 TBD 11,570<br />

Total, Construction 59,141 53,296 59,141<br />

Total, TEC 65,796 65,796 65,796<br />

Contingency, TEC 12,190 TBD 12,190<br />

Other Project Cost (OPC)<br />

OPC except D&D<br />

Conceptual Planning 3,228 3,228 3,228<br />

Conceptual Design 2,772 513 2,772<br />

Start-Up 2, 000 TBD 2,000<br />

Contingency 2, 000 TBD 2,000<br />

Total, OPC except D&D 10,000 TBD 10,000<br />

D&D<br />

D&D N/A N/A N/A<br />

Contingency N/ A N/A N/A<br />

Total, D&D N/A N/A N/A<br />

Total, OPC 10,000 TBD 10,000<br />

Contingency, OPC 2,000 TBD 2,000<br />

Total, TPC 75,796 TBD 75,796<br />

Total, Contingency 14,190 TBD 14,190<br />

Weapons Activities/RTBF/Construction/<br />

10-D-501, Nuclear Facility Risk Reduction, Y-12 Page 190<br />