Total Estimated Cost (TEC)<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

(dollars in thousands)<br />

Current Total<br />

Estimate<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Design (PED)<br />

Preliminary Design (06-D-140) 12,619 1 1,619 TBD<br />

Contingency 2,065 2,065 TB D<br />

Final Design (11-D-801) 9,930 0 TBD<br />

Final Design Contingency 2,770 0 TBD<br />

Total, Design 27,384 13,684 TBD<br />

Construction<br />

Site Preparation TBD TBD TBD<br />

Equipment TBD TBD TBD<br />

Other Construction TBD TBD TBD<br />

Contingency TBD TBD TBD<br />

Total, Construction 56,715 TBD TBD<br />

Total, TEC 84,099 TBD TBD<br />

Contingency, TEC TBD TBD TBD<br />

Other Project Cost (OPC)<br />

OPC except D&D<br />

Conceptual Planning TBD TBD TBD<br />

Conceptual Design TBD TBD TBD<br />

Start-Up TBD TBD TBD<br />

Contingency TBD TBD TBD<br />

Total, OPC except D&D 15,477 TBD TBD<br />

D&D<br />

D&D N/A N/A TBD<br />

Contingency N/A N/A TBD<br />

Total, D&D N/A N/A TBD<br />

Total, OPC 15,477 TBD TBD<br />

Contingency, OPC TBD TBD TBD<br />

Total, TPC 99,576 TBD TBD<br />

Total, Contingency TBD TBD TBD<br />

Weapons Activities/RTBF/Construction/<br />

11-D-801, TA-55 Reinvestment Project II, LANL Page 182<br />