02.08.2013 Views

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

Department of Energy FY 2012 Congressional ... - The FIRE Place

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>FY</strong> 2010<br />

Actual <strong>FY</strong> 2011 <strong>FY</strong> <strong>2012</strong><br />

Approp Request Request<br />

maintenance/repair activities, production and delivery <strong>of</strong> components for each weapon type,<br />

refurbishment and replacement <strong>of</strong> aging components, and major refurbishment activities to<br />

extend stockpile life;<br />

(2) Weapon surveillance includes new material laboratory tests, new material flight tests,<br />

retr<strong>of</strong>it evaluation system laboratory and flight tests, stockpile laboratory tests, stockpile<br />

flight tests, quality evaluations, special testing, and surveillance <strong>of</strong> weapon systems to<br />

support assessment <strong>of</strong> the safety, security, and reliability <strong>of</strong> the nuclear weapons stockpile,<br />

which contribute to the Annual Certification to the President;<br />

(3) Weapon Assessment and Support includes Stockpile R&D activities conducted in the<br />

following areas: maintain system certification, assess the safety, security and reliability <strong>of</strong><br />

the nuclear weapons stockpile to form the basis <strong>of</strong> the Annual Assessment to the President<br />

which provides critical data certification in the absence <strong>of</strong> nuclear testing, respond to<br />

emerging problems or issues in a timely manner including resolution <strong>of</strong> Significant Finding<br />

Investigations-NNSA evaluates any report <strong>of</strong> a weapon anomaly and if necessary, opens a<br />

formal investigation;), support directive schedules, develop modern physics and engineering<br />

baselines, perform development and engineering to support refurbishments approved by the<br />

NWC, develop refurbishment technologies, maintain flexibility to respond to requirements,<br />

and maintain the capability to refurbish and design new weapons and weapons components<br />

as required; and<br />

(4) Development Studies/Capability Improvements includes activities associated with<br />

technical basis improvements, technology maturation, system studies, and other surety<br />

advancements for the stockpile.<br />

B61 Stockpile Systems 114,195 317,136 72,396<br />

<strong>The</strong> B61 family includes five modifications with two distinct categories which include the<br />

strategic category <strong>of</strong> the B61 Modifications 7 and 11, with the Modification 11 as the only<br />

active earth penetrating weapon, and the non-strategic category <strong>of</strong> the B61 Modifications 3,<br />

4, and 10 used for the US extended nuclear commitment. <strong>The</strong> NNSA provides nuclear<br />

gravity bombs to the US Air Force for integration with the B-2 Spirit bomber and to US and<br />

NATO Dual Capable Aircraft.<br />

• B61 System Sustainment 59,456 65,495 72,396<br />

In accordance with National Requirements Documents and/or Directive Schedules,<br />

<strong>FY</strong> <strong>2012</strong> mission scope includes:<br />

(1) Weapon Maintenance: produce LLCs/perform LLCEs on GTSs and NGs as<br />

required; execute repair<br />

Weapons Activities/<br />

Directed Stockpile Work Page 65<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!