10-D-903, Security Upgrades, KAPL, Schenectady, NY<br />

Project Data Sheet (PDS) is for PED/Construction<br />

1. Significant Changes<br />

<strong>The</strong> most recent DOE O 413.3B approved Critical Decision (CD) is CD-1, Approve Alternative<br />

Selection and Cost Range, which was approved on August 13, 2010, with a preliminary cost range <strong>of</strong><br />

$19,000 to $23,000 and a CD-4 <strong>of</strong> <strong>FY</strong> 2016.<br />

A Federal Project Director at the appropriate level has been assigned to this project.<br />

This PDS is a continuation <strong>of</strong> a PED PDS proceeding to construction in <strong>FY</strong> 2013. <strong>The</strong>re have been no<br />

significant changes to scope, cost, schedule, or risks associated with this project.<br />

2. Design, Construction, and D&D Schedule<br />

(fiscal quarter or date)<br />

CD-0 CD-1<br />

PED<br />

Complete CD-2 CD-3 CD-4 D&D Start<br />

D&D<br />

Complete<br />

<strong>FY</strong> 2010 4/22/2008 2Q<strong>FY</strong> 2009 2Q<strong>FY</strong> 2013 TBD TBD TBD TBD TBD<br />

<strong>FY</strong> 2011 4/22/2008 4Q<strong>FY</strong> 2009 4Q<strong>FY</strong> <strong>2012</strong> TBD TBD TBD TBD TBD<br />

<strong>FY</strong> <strong>2012</strong> 4/22/2008 8/13/2010 4Q<strong>FY</strong> <strong>2012</strong> TBD TBD TBD TBD TBD<br />

CD-0 – Approve Mission Need<br />

CD-1 – Approve Alternative Selection and Cost Range<br />

CD-2 – Approve Performance Baseline<br />

CD-3 – Approve Start <strong>of</strong> Construction<br />

CD-4 – Approve Start <strong>of</strong> Operations or Project Closeout<br />

D&D Start – Start <strong>of</strong> Demolition & Decontamination (D&D) work<br />

D&D Complete – Completion <strong>of</strong> D&D work<br />

3. Baseline and Validation Status<br />

(dollars in thousands)<br />

TEC,<br />

PED<br />

TEC,<br />

Construction TEC, Total<br />

OPC<br />

Except D&D a<br />

OPC,<br />

D&D OPC, Total TPC<br />

<strong>FY</strong> 2010 2,000 TBD TBD 400 TBD TBD TBD<br />

<strong>FY</strong> 2011 2,000 TBD TBD 300 TBD TBD TBD<br />

<strong>FY</strong> <strong>2012</strong> 2,000 TBD TBD 400 TBD TBD TBD<br />

4. Project Description, Justification, and Scope<br />

<strong>The</strong> Kesselring Site Operation (KSO) Security Upgrades project will replace and upgrade security<br />

related infrastructure at the Kesselring Site. <strong>The</strong> advanced age and degradation <strong>of</strong> the currently installed<br />

a Includes conceptual planning and design.<br />

Naval Reactors/Construction<br />

10-D-903 –Security<br />

Upgrades, KAPL, Schenectady, NY Page 471<br />