(dollars in thousands)<br />

App ropriations Obligations Costs<br />

Total Project Cost (TPC)<br />

<strong>FY</strong> 1999 38,378 38,378 17,612<br />

<strong>FY</strong> 2000 48,120 46,765 37,937<br />

<strong>FY</strong> 2001 47,149 44,997 47,025<br />

<strong>FY</strong> 2002 38,699 42,206 47,026<br />

<strong>FY</strong> 2003 56,346 56,346 68,022<br />

<strong>FY</strong> 2004 73,581 72,755 62,854<br />

<strong>FY</strong> 2005 57,702 58,302 67,353<br />

<strong>FY</strong> 2006 68,801 68,704 52,154<br />

<strong>FY</strong> 2007 54,789 55,062 40,011<br />

<strong>FY</strong> 2008 29,761 29,761 41,912<br />

<strong>FY</strong> 2009 53,344 53,344 57,377<br />

<strong>FY</strong> 2010 89,101 89,101 66,659<br />

<strong>FY</strong> 2011 192,999 192,999 105,527<br />

<strong>FY</strong> <strong>2012</strong> 221,600 221,600 167,500<br />

<strong>FY</strong> 2013 362,507 362,507 342,000<br />

<strong>FY</strong> 2014 371,512 371,512 342,500<br />

<strong>FY</strong> 2015 338,000 338,000 312,450<br />

<strong>FY</strong> 2016 407,000 407,000 388,000<br />

<strong>FY</strong> 2017 TBD TBD TBD<br />

<strong>FY</strong> 2018 TBD TBD TBD<br />

<strong>FY</strong> 2019 TBD TBD TBD<br />

Total, TPC TBD TBD TBD<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

Total Estimated Cost (TEC)<br />

Current<br />

Total<br />

Estimate<br />

(dollars in thousands)<br />

Previous<br />

Total<br />

Estimate<br />

Original<br />

Validated<br />

Baseline<br />

Design<br />

Design TBD TBD TBD<br />

Contingency TB D TBD TBD<br />

Total, Design TBD TBD TBD<br />

Construction<br />

Site Preparation TBD TBD TBD<br />

Equipment TBD TBD TBD<br />

Other Construction TBD TBD TBD<br />

Contingency TB D TBD TBD<br />

Total, Construction TBD TBD TBD<br />

Total, TEC TBD TBD TBD<br />

Contingency, TEC TBD TBD TBD<br />

Defense Nuclear Nonproliferation/<br />

Fissile Materials Disposition/<br />

99-D-141-01, Pit Disassembly and<br />

Conversion <strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget<br />