FIRP is complementary to the ongoing programmatic base maintenance and infrastructure efforts at<br />

NNSA sites. Maintenance and infrastructure are primarily funded by the Readiness in Technical Base<br />

and Facilities (RTBF) program and through site overhead allocations to ensure that facilities necessary<br />

for immediate programmatic workload activities are sufficiently maintained. FIRP addresses the<br />

additional sustained investments above the RTBF base for focused reduction <strong>of</strong> deferred maintenance to<br />

extend facility lifetimes, reduce the risk <strong>of</strong> unplanned system and equipment failures, increase<br />

operational efficiency and effectiveness, allow for the recapitalization <strong>of</strong> aging facility systems, and<br />

remove hazards to workers by improving safety. FIRP works in partnership with RTBF to ensure the<br />

facilities and infrastructure <strong>of</strong> the nuclear security enterprise are restored to an appropriate condition to<br />

support the Stockpile Stewardship Program mission, transformation <strong>of</strong> the Enterprise, and to<br />

institutionalize responsible and accountable facility management practices.<br />

Annual Performance Results and Targets<br />

<strong>The</strong> <strong>Department</strong> is in the process <strong>of</strong> updating its strategic plan, and has been actively engaging<br />

stakeholders including Congress. <strong>The</strong> draft strategic plan is being released for public comment<br />

concurrent with this budget submission, with the expectation <strong>of</strong> <strong>of</strong>ficial publication this spring. <strong>The</strong><br />

draft plan and <strong>FY</strong> <strong>2012</strong> budget are consistent and aligned. Updated measures will be released at a later<br />

date and available at the following link http://www.mbe.doe.gov/budget/12budget/index.htm.<br />

<strong>FY</strong> 2010 Accomplishments<br />

All FIRP line item construction projects were rated as "Green" for cost and schedule by the DOE<br />

Office <strong>of</strong> Engineering and Construction Management (OECM).<br />

FIRP exceeded its annual target and reached 89 percent <strong>of</strong> its goal by funding $65.4 million <strong>of</strong><br />

legacy deferred maintenance for high priority projects in mission critical facilities.<br />

08-D-601, Mercury Highway Project at the Nevada National Security Site was successfully<br />

completed under budget. Due to favorable construction bids, an additional nine miles was paved,<br />

resulting in the reconstruction <strong>of</strong> the entire Mercury Highway up to Gate 700, where most <strong>of</strong> the Air<br />

Force vehicular traffic enters the base. <strong>The</strong> remaining $1.652M was reprogrammed and utilized by<br />

the Recapitalization subprogram.<br />

06-D-601, Electrical Distribution System Upgrade and the 06-D-602, Gas Main and Distribution<br />

System Upgrades at Pantex Plant have successfully been completed and put into service. Both<br />

projects were completed within the approved baseline schedule and under budget.<br />

08-D-602, Potable Water Systems Upgrade and 08-D-603, Steam Plant Life Extension Projects, both<br />

at the Y-12 National Security Complex were completed within the approved baseline cost and<br />

schedule.<br />

<strong>The</strong> Facility Disposition subprogram was reconstituted through the reallocations from the<br />

Recapitalization subprogram in order to execute several disposition projects. <strong>The</strong>se include the<br />

demolition <strong>of</strong> excess facilities to enable the reduction <strong>of</strong> the PIDAS at the Y-12 National Security<br />

Complex, the demolition <strong>of</strong> facilities at Lawrence Livermore National Lab and the Pantex Plant<br />

which have exceeded their useful life and are no longer habitable, and to initiate demolition <strong>of</strong><br />

several TA-18 facilities at Los Alamos National Lab.<br />

Major Outyear Priorities and Assumptions<br />

<strong>The</strong> outyear projections for FIRP total $94,000,000 (<strong>FY</strong> 2013). FIRP is a finite program with a<br />

<strong>Congressional</strong>ly-mandated end date <strong>of</strong> <strong>FY</strong> 2013.<br />

Weapons Activities/<br />

Facilities and Infrastructure<br />

Recapitalization Program Page 268<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!