Operations <strong>of</strong> Facilities<br />

Kansas City Plant (KCP)<br />

Explanation <strong>of</strong> Funding Changes<br />

<strong>FY</strong> <strong>2012</strong> vs.<br />

<strong>FY</strong> 2011<br />

Request<br />

($000)<br />

This decrease results from completion <strong>of</strong> the purchase <strong>of</strong> long<br />

lead major equipment, which was funded in <strong>FY</strong> 2011, as KCP<br />

transitions to its new site. -29,885<br />

Lawrence Livermore National Laboratory<br />

<strong>The</strong> increase provides adequate funding to support the<br />

minimum-operations <strong>of</strong> nuclear facilities during de-inventory<br />

and increase the availability <strong>of</strong> Site 300 in support <strong>of</strong> required<br />

science technology and engineering activities. +3,884<br />

Los Alamos National Laboratory<br />

This increase reflects increased support in the processing <strong>of</strong><br />

Stored Newly Generated (SNG) TRU waste at Area G in order<br />

to remediate and close Area G by December 2015 which is<br />

partially <strong>of</strong>fset by reduced operations at CMR facility due to<br />

the continued reduction <strong>of</strong> material at risk within the facility. +62<br />

Nevada National Security Site<br />

<strong>The</strong> increase supports a minimum-operations capability at<br />

DAF, U1a, JASPER, BEEF and Baker to support the full suite<br />

<strong>of</strong> Stockpile Stewardship mission requirements while<br />

concurrently maintaining experimental capabilities. <strong>The</strong> level<br />

<strong>of</strong> funding requested stabilizes the RTBF funded workforce<br />

levels supporting these missions.<br />

Pantex Plant<br />

<strong>The</strong> increase adjusts funding to meet required minimumoperational<br />

levels due to the increasing investments in<br />

corrective maintenance to address degrading and aging<br />

infrastructure. Increased investment will provide<br />

improvements to the plant site in areas (such as high explosive<br />

facilities) which will enable continued sustainment <strong>of</strong> operable,<br />

secure, and compliant conditions in support <strong>of</strong> the increased<br />

surveillance, LEP and dismantlement activities.<br />

+17,482<br />

+43,594<br />

Weapons Activities/<br />

Readiness in Technical Base and Facilities Page 158<br />

<strong>FY</strong> <strong>2012</strong> <strong>Congressional</strong> Budget

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!