(dollars in thousands)<br />

App ropriations Obligations Costs<br />

<strong>FY</strong> 2014 12,144 12,144 14,300<br />

<strong>FY</strong> 2015 400 400 11,500<br />

<strong>FY</strong> 2016 553 553 13,657<br />

<strong>FY</strong> 2017 348 348 348<br />

Total, TPC 146,705 146,705 146,705<br />

6. Details <strong>of</strong> Project Cost Estimate<br />

(dollars in thousands)<br />

Current Previous Original<br />

Total Total Validated<br />

Estimate Estimate Baseline<br />

Total Estimated Cost (TEC)<br />

Design (PED)<br />

Design 7 ,948 7,948 7,122<br />

Contingency 0 0 1,024<br />

Total, PED 7,948 a<br />

7,948 8,146<br />

Construction<br />

Site Preparation<br />

Equipment<br />

800<br />

0<br />

800 0<br />

b<br />

0 7,816<br />

Other Construction 114,891 112,384 51,579<br />

Contingency 18 ,526 12,788 8,745<br />

Total, Construction 134,217 125,972 68,140<br />

Total, TEC 142,165 133,920 76,286<br />

Contingency, TEC 18,526 12,788 9,769<br />

Other Project Cost (OPC)<br />

a PED reduced due to the withdrawal <strong>of</strong> uncosted funds.<br />

OPC except D&D<br />

Conceptual Planning 1,166 1,166 1,166<br />

Conceptual Design 355 355 998<br />

Other 36 4 123 161<br />

Start-Up 1, 631 1,631 1,485<br />

Contingency 1, 024 1,017 482<br />

Total, OPC except D&D 4,540 4,292 4,292<br />

b <strong>The</strong> initial plan was for equipment to be government furnished (GFE). <strong>The</strong> current plan calls for equipment to be included<br />

in the construction contract. <strong>The</strong>refore, equipment cost is now included in “Other Construction.” <strong>The</strong> increase also reflects<br />

actual bids received before the project was deferred, which have been escalated for the current estimate.<br />

Weapons Activities/RTBF/Construction/<br />

08-D-802, HE Pressing Facility, PX Page 205<br />